12.01 Passage of Risk/Ownership<br />

The title to all Indian materials, delivered by the contractor, shall pass on to the Purchaser on its<br />

being handed over to the nominated transporter.<br />

13.00 LIQUIDATED DAMAGES FOR DELAY IN COMPLETION (LD)<br />

If the contractor fails in the due performance of the contract to supply / erection/ testing/<br />

commissioning the equipment within the time fixed by the contract or any extension thereof, he<br />

shall be liable at the discretion of the Engineer to the Liquidated damages and not by way of<br />

penalty amounting to one half of one percent (1/2%) of the contract price per week. The<br />

contractor’s liability for delay shall not in any case exceed ten percent (10%) of the total contract<br />

price.<br />

If the Contractor shall fail to supply the equipment or any part thereof within a reasonable period<br />

after the expiry of the appointed time or extended time as may be provided for in the contract, the<br />

provisions in Clause No. 28 “Negligence” shall become operative, in addition to the liability of L.D.<br />

as above.<br />

14.00 IMPORT LICENCE AND FOREIGN EXCHANGE<br />

In case of supply of equipment of indigenous manufacture including any imported components, the<br />

Contractor shall arrange for necessary Import License & Foreign Exchange.<br />

In the event of Contractor requiring Actual User’s for import of equipment and/components,<br />

Purchaser shall arrange for obtaining necessary assistance in this regard. Government<br />

authorization may be required to permit the manufacture of certain equipment. The parties shall<br />

assist each other in every manner possible in securing such authorization.<br />

15.00 CONTRACTOR’S DOCUMENTS, DRAWINGS AND INSTRUCTION MANUALS<br />

15.01 The Contractor shall be responsible for developing detail drawings to adapt his equipment and<br />

materials to the requirement indicated in the tender specification.<br />

15.02 Within a reasonable time not exceeding thirty days from the date of receipt Purchaser’s Letter of<br />

Intent, the Contractor shall provide the Purchaser with the following drawings and data:<br />

a) Six (6) marked up copies of technical particulars to make them conforming to accepted<br />

proposals.<br />

b) Outline drawings of all equipment together with weights and sufficient overall dimensions<br />

to enable the Purchaser to design foundations and structures and associated equipment.<br />

Tender Documents Commercial (Indigenous) Page 15 of 56