equipments to provide the best co co-ordinated ordinated performance of the entire system. The basic<br />

requirements are detailed out in various clauses of the Technical Specifications. The design<br />

of various components, assemblies and subassemblies shall be done so tha that it facilitates easy<br />

field assembly and dismantling. All the rotating components shall be so selected that the<br />

natural frequency of the complete unit is not critical or close to the operating range of the<br />

unit.<br />

4.7 DOCUMENTS, DATA AND DRAWINGS TO BE FURN FURNISHED ISHED BY CONTRACTOR<br />

4.7.1 Contractors may note that this is a contract inclusive of the scope as indicated elsewhere in<br />

the specification. Each of the plant and equipment shall be fully integrated, engineered and<br />

designed to perform in accordance with the technical specification. All engineering and<br />

technical services required ensuring a completely engineered plant shall be provided in<br />

respect of mechanical, electrical, control & instrumentation, civil & structural works as per<br />

the scope. The Contractor sh shall all furnish engineering data/drgs. in accordance with the<br />

schedule of information as specified in Technical Specification and data sheet.<br />

4.7.2 The number of copies/prints/CD<br />

copies/prints/CD-ROMs/manuals ROMs/manuals to be furnished for various types of<br />

documents is given in Section 5. . Distribution schedule shall be informed to successful<br />

Contractor.<br />

4.7.3 The documentation that shall be provided by the Contractor is indicated in the various<br />

sections of specification. This documentation shall include but not be limited to the<br />

following :<br />

4.8 INSTRUCTION MANUALS<br />

The Contractor shall submit to the Employer, Instruction Manuals for all the equipments<br />

covered under the Contract. The Instruction manuals shall contain full details required for<br />

erection, commissioning, operation and maintenance of each equipment. The ma manual shall<br />

be specifically compiled for this project. The Instruction Manuals shall comprise of the<br />

following.<br />

4.8.1 Erection Manuals<br />

The erection manuals shall be submitted prior to the commencement of erection activities<br />

of particular equipment/system<br />

equipment/system. . The erection manual should contain the following as a<br />

minimum.<br />

a) Erection strategy.<br />

b) Sequence of erection.<br />

c) Erection instructions.<br />

d) Critical checks and permissible deviation/tolerances.<br />

e) List of tool, tackles, heavy equipments like cranes, dozers, etc.<br />

f) Bill of Materials<br />

g) Procedure for erection.<br />

h) General safety procedures to followed during erection/installation.<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />