1.2.15 Installation stallation and connection of all piping and fittings within the scope of work shall be<br />

responsibility of the successful Bidder.<br />

1.2.16 The successful Bidder shall be responsible for checking the correctness of erection of<br />

mechanical equipment, technolog technological ical structures and auxiliary systems, electrical equipment<br />

etc. as per the specification.<br />

1.2.17 The successful bidder has to carry out the work in such a manner that it does not affect the<br />

operation of other plant/ shop. If other Contractors are also eengaged<br />

ngaged in the same work site<br />

for other jobs the bidder shall work with them in a co co-ordinated ordinated manner.<br />

1.2.18 The successful Bidder shall be responsible for the management of erection work with proper<br />

and adequate supervision for ensuring progress of ere erection ction work and quality of<br />

workmanship.<br />

1.2.19 The successful Bidder shall deploy required number of supervisory, skilled, unskilled and<br />

auxiliary labour as required for the erection work: as per detail mobilisation schedule (to be<br />

furnished with Bid by successful Bidder) and comply with such reasonabl reasonable instructions of the<br />

Purchaser / Consultant in the interest of satisfactory progress and completion of the work<br />

according to the schedule. The successful Bidder shall work in 3 shifts per day basis for<br />

meeting the completion target, if required within the contract price.<br />

1.2.20 The successful Bidder shall organise the work in a manner that other work at site is not<br />

impeded and the workmen therein not endangered and shall arrange temporary access at<br />

site, if required for the erection work.<br />

1.2.21 Successful essful Bidder shall return to the Purchaser all crates, packing cases and packing<br />

materials excess commissioning spares, oil and lubricants at a place designated by the<br />

Purchaser.<br />

1.2.22 The successful Bidder shall conduct all necessary tests / checks dduring<br />

uring erection.<br />

1.2.23 The successful Bidder shall attend to the rectification of erection defects, if any,<br />

expeditiously. The successful Bidder shall arrange all testing instruments for such testing at<br />

site.<br />

1.2.24 The successful Bidder shall carry out final painting of the Plant & Equipment and<br />

technological Structures etc. erected as per the instructions stipulated in the Technical<br />

Specification.<br />

1.2.25 The successful Bidder shall be responsible for total commissioning of the Plant and<br />

equipment including cold trial run and demonstration of Performance Guarantee Test. The<br />

Purchaser's supervisory and skilled operating personnel shall, however, be available to work<br />

under the guidance and supervision of the Bidder. Necessary raw materials, auxiliari auxiliaries,<br />

Technical Specification: Sec-3,Special 3,Special Stipulation To The Bidders<br />

Page 7 of 11