3.1.24 First fill of all consumables e.g.; oils and lubricants for one year toppings r rrequirements.<br />

3.1.25 Preservative shop coating, final painting of all structures and equipment under the scope.<br />

3.1.26 (a) Adequate fire alarm & detection of coal conveyor gallery area, Junction unction houses, Wagon<br />

tippler area, Electrical switch gear rooms, Co Control ntrol rooms, Battery rooms, Transformer<br />

rooms, cable spreader rooms etc. consisting of heat detectors detectors(both (both ceiling mounted &<br />

Canopy mounted type), smoke detectors, LHS cables, manual call points, fire alarm panels at<br />

main control room of Wagon Tippler, rep repeater eater panel at CISF Fire control room near CPP<br />

main gate etc shall be considered. Fire alarm & de detection ction system shall be of Intelligent<br />

Addressable type of Notifire/Siemens make.<br />

(b) b) The successful bidder is to obtain necessary approval from TAC for the complete Fire<br />

protection System of Wagon Tippler Package.<br />

(c) c) Underground pipes will be M.S heavy duty with coating wrapping by 4mm thick coal tat<br />

tape conforming to IS15337 (latest version). Over ground pipes shall be of he heavy duty GI<br />

pipes with fittings etc. Suitable number of water actuated deluge valves shall be provided<br />

for the hydrant system. Hydrant line will be tapped suitably from the existing hydrant net<br />

work.<br />

(d) d) The coal conveyors shall also be provided with MVW (Medium Velocity Water) Spray<br />

System which h will be operating automatically for protection of conveyors.<br />

3.2 Electrical System / Equipment<br />

3.2.1 Unless specifically excluded, contractor’s scope of work shall include all electrical wor works as<br />

required for putting into successful operation of the Wagon Tipplers & Associated Conveyors<br />

covered under this specification.<br />

3.2.2 LT SWITCHGEAR<br />

415V Switchgear/motor control centers distribution boards, AC & DC fuse boards, local<br />

emergency stop push button stations for all drives and local motor starters as required for<br />

plant and equipment.<br />

3.2.3 MOTORS<br />

Motors along with couplings and coupling guards for all rotating auxiliaries are covered<br />

under this package. All motors shall be with cable glands & lugs.<br />

3.2.4 CABLES<br />

HT & LT Power cables, control cables, Instrumentation cables and any special cables required<br />

for connection between equipment / devices in Contractor’s scope and also cables between<br />

Owner’s equipment and Contractor's equipment.<br />

3.2.5 CABLING, EARTHING AND LIGHTNING PROTECTION<br />

Technical Specification Sec-2,:Intent :Intent of Specifications<br />

Page 8 of 17