25.04.2013 Views

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ELECTRICS FOR WAGON TIPPLER SYSTEM<br />

1.0 SPECIAL INSTRUCTIONS TO BIDDERS<br />

1.1 Inspection of site by Bidder<br />

Bidder shall inspect the site and examine and obtain all information required and satisfy<br />

himself regarding all matters such as access to site, communication, transport, right of way,<br />

the availability of local labour, availability and rates of materials, local working conditions,<br />

extreme weather conditions, uncertainty of weather, obstructions and hindrances that m mmay<br />

arise, etc, which may affect the work or cost thereof, before the submission of his tender.<br />

Ignorance of site conditions shall not be accepted as basis for any claim for compensation.<br />

The submission of tender by Bidder will be construed as evidence tha that t such an examination<br />

was made and any later claims / disputes in regard to price quoted shall not be entertained<br />

or considered.<br />

Bidder shall also indicate in his bid all the major assumptions including major design<br />

assumptions / criteria made by him on which the bid is based.<br />

1.2 Compliance with Specification<br />

All equipment and accessories covered under this specification shall conform to the<br />

“Technical Specifications” given in this document.<br />

In case alternative type of equipment is offered, all technical particulars of equipment<br />

offered, number of such equipment supplied in India, reference list of installations where<br />

such equipment is in operation as per qualifying requirements, type test cer certificates of their<br />

collaborators, type test certificates of indigenously made equipment, extent of import<br />

content and availability of spares indigenously, along with any other data for considering the<br />

alternative equipment shall be furnished with the offer offer. . The Purchaser, however, reserves<br />

the right to accept or reject the proposal without assigning any reason.<br />

All equipment shall be suitable for voltage/frequency variations and other data given in<br />

Electrical System Design.<br />

The contractor shall be responsible for satisfactory working of system with guaranteed<br />

parameters. All the major equipment shall be installed, tested and commissioned under<br />

supervision of representative of manufacturer of respective equipment.<br />

1.3 Standards and Regulations<br />

Technical Specification:Sec-6, Electrical<br />

SECTION 6<br />

Page 1 of 97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!