3.1.13 Air conditioning of Wagon Tippler control room room, PLC room and battery room room, complete with<br />

all electrical, civil & structural works etc.<br />

3.1.14 Exhaust fans for all toilets complete with electrical, civil & structural works etc. Exhaust fans<br />

along with required ducting shall also be provided for all underground structures/Transfer<br />

Points.<br />

3.1.15 Minimum of four (4) Nos. sump pumps in Wagon Tippler house complete with motors, local<br />

control panel, level switches, individual discharge piping with fittings and valves to nearest<br />

plant drain etc.<br />

3.1.16 A complete dust suppression system for contr control ol of fugitive dust at Wagon tippler, apron<br />

feeder, transfer points, complete with enclosed pump houses, water tanks, pumps, drives,<br />

hoisting arrangements, piping, valves etc. electrical, accessories, civil and structural works as<br />

briefly specified below:<br />

a) Plain water dust suppression through fogging nozzles for control of dust during Wagon<br />

Tippler operation.<br />

b) Dry fog type dust suppression system at all Transfer Points both at discharge and<br />

loading points including all electrical and accessories.<br />

c) Compressor units, Pump houses & water tanks for dust suppression, service water and<br />

cooling water system.<br />

3.1.17 Cooling water system for scoop coupling, Service water system for Wagon Tippler Package<br />

System shall be taken from nearest header located at new track ho hopper pper area.<br />

3.1.18 An E.O.T crane for installation & maintenance of equipment in wagon tippler complex<br />

complete with all electrical and control including the covered structural steel shed.<br />

3.1.19 Monorails and electrically operated hoist blocks as well aas<br />

s hand operated chain pulley blocks<br />

for servicing/installation/easy replacement of drive machinery, different types of pulleys for<br />

all conveyors, GTU and other equipment.<br />

3.1.20All All buildings in contractor’s scope shall be complete with all electrical, civ civil, structural,<br />

architectural works, cable trenches, fire safety walls, foundation / fencing / earthing earthingfor all<br />

equipments, structures, transformers etc. . All cables / duct banks, trenches, cable trestles<br />

shall be complete with associated civil/ structural wwork<br />

ork and necessary civil foundations.<br />

3.1.21 Drainage of Wagon Tippler hoppers, tunnels, conveyor galleries, TPs, upto nearest existing<br />

CHP drain including all civil & structural works.<br />

3.1.22 All equipment/fittings, supporting structure, along with inser insert t plates, bolts, accessories, MS<br />

sleeves, base plates, grouting as may be required and proper alignment etc.<br />

3.1.23 A complete set of all special tools and tackles, which are necessary or convenient for<br />

erection, commissioning and overhauling of any equipment, covered under the scope.<br />

Technical Specification Sec-2,:Intent :Intent of Specifications<br />