endanger the safe operation of the equipment, shall not be considered as reasons for<br />

with- holding the aforesaid permission<br />

(i) Contractor ctor shall furnish the commissioning organization chart for review & acceptance<br />

of employer at least eighteen months prior to the schedule date of synchronization of<br />

1st unit. The chart should contain:<br />

a) Experience of the Commissioning Engineers.<br />

b) Role and responsibilities sponsibilities of the Commissioning Organisation members.<br />

c) Expected duration of posting of the above Commissioning Engineers at site.<br />

4.17 GUARANTEE TESTS<br />

(a) The final tests as to the guarantees shall be conducted at Site, by the Contractor. The<br />

Contractor's Commissioning and start start-up up Engineers shall make the unit ready for such<br />

tests. Such test will be commenced, within a period of three (3) months after the<br />

successful completion of Trial Operation. Any extension of time beyond the above three<br />

months shall be subject to Employer's approval.<br />

(b) These tests shall be binding on both the parties of the Contract to determine<br />

compliance of the equipment with the performance guarantee.<br />

(c) Any special equipment, tools and tackles required for the successful completion of the<br />

Guarantee Tests shall be provided by the Contractor, free of cost cost. The bidder should<br />

particularly note that suitable and necessary method and arrangement for the PG test<br />

for 1200TPH of the new conveyor integrating into 800 TPH of existing conveyor system<br />

has to be made by him/them acceptable to owner/RITES at no extra cost.<br />

(d) The guarantee figures and design/performance parameters of the equipment shall be<br />

proved by the Contractor during these Guarantee Tests/ and or during the 'Trial<br />

operation' as detai detailed led out elsewhere. Should the results of these tests show any<br />

deterioration from the guaranteed values, the Contractor shall modify the equipment as<br />

required to enable it to meet the guarantees. In such case, the Guarantee Tests shall be<br />

repeated and all ccost<br />

ost for modifications including labour, materials and the cost of<br />

additional testing to prove that the equipment meets the guarantees, shall be borne by<br />

the Contractor.<br />

(e) The specific tests to be conducted on equipment have been brought out in the technical<br />

specification.<br />

4.18 Test Codes<br />

The provisions outlined in the ASME Performance Test Codes shall be used as a guide for all<br />

the above test procedures unless otherwise specified in the technical specifications.<br />

4.19 TAKING OVER<br />

Upon successful completio completion n of Initial Operations and all the tests conducted to the<br />

Employer's satisfaction, the Employer shall issue to the Contractor a Taking over Certificate<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />