25.04.2013 Views

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

linking while the faulty conveyor / equipment will be fast blinking. Start command shall not<br />

be initiated unless reset button in pressed after clearance offault.<br />

The sequence of operation of the annunciation system shall be as follows: follows:-<br />

Condition<br />

Status<br />

Normal : Ann. Window : Off.<br />

Status indication : Steady glow<br />

Buzzer<br />

: Off.<br />

Fault : Ann. Window : Blinking.<br />

Status indication : Fast blinking<br />

Buzzer<br />

: Sounding.<br />

Press Accept PB.<br />

Ann. Window : Steady glow.<br />

Status indication : Fast blinking<br />

Buzzer<br />

: Off.<br />

Press Reset PB (When fault is cleared):<br />

Ann. Window : Off.<br />

Status indication : i) Steady blinking (if on selected path)<br />

ii) Off (if not on selected path)<br />

Buzzer.<br />

: Off.<br />

4.3.7 Dust Suppression System<br />

(a.) Conveyors / Equipment<br />

1. It shall be possible to spray the water on to coal stream only when corresponding<br />

conveyors/equipment’s are running with material at spray application points.<br />

2. If a running pump trips stand stand-by pump shall start automatically. lly. It shall be possible to select<br />

any of the pumps as auto standby from main CHP control room.<br />

3. Pump/pumps shall trip with a time delay, if discharge valves fail to open. Suitable<br />

pressure/flow switch shall be provided to sense this condition.<br />

4. Pumps shall trip in case of low level of water in tank.<br />

5. All feeding pumps to tank shall trip in case of high high-high level in tank.<br />

6. All the controls shall be through control desk.<br />

(b.) Wagon unloading<br />

1. System shall be operated from local control panel.<br />

2. Dust suppression system shall be provided to cover the WT Hopper.<br />

3. Pumps shall be started manually or from control panel. . If any of the pump/pumps trips,<br />

stand-by by pump/pumps shall start automatically. It shall be possible to select any of the<br />

pumps as auto stand - by.<br />

4. Pumps shall trip in case of low level of water in tank.<br />

5. Following annunciation’s shall be provided at local control panel.<br />

Technical Specification:Sec-4,System System Parameters, Operation & Control Philosophy<br />

Page 10 of 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!