his own cost for distribution to the occupants of the colony as per Electricity Rules<br />

& Acts. The site area and colony shall be sufficiently lighted to avoid accidents.<br />

(IX) The Contractor will have to provide and install his own light and power meters<br />

which will be governed as per Central/State Govt. Electricity Rules. The meters<br />

shall be sealed by the Purchaser.<br />

(X) In case of damage to any of the Purchaser’s equipment on account of fault,<br />

intentional or unintentional on the part of the Contractor, the purchaser reserves<br />

the right to recover the cost of such damage from the contractor’s bill.<br />

(XI) After completion of work, the Contractor shall promptly dismantle, at his own cost<br />

distribution and other facilities that he may have erected and shall also remove the<br />

same within a reasonable time fixed by the Engineer and on his failure to do so the<br />

Purchaser will be entitled to realize from his reasonable compensation fixed by the<br />

Engineer and also to remove them at the cost of the Contractor.<br />

(XII) Only motors up to 3HP will be allowed to be started direct on line. For motors<br />

above 3 HP and up to 100 HP suitable starting devices approved by the Purchaser<br />

Engineer, shall be provided by the Contractor. For Motors above 100 HP slip ring<br />

induction motors with suitable starting devices as approved by the Engineer shall<br />

be provided by the Contractor.<br />

(XIII) The single line distribution system with loadings and specifications shall be<br />

submitted to the Engineer for his approval before the system is installed. The<br />

system shall conform to Central/State Statutory provisions Act, with latest<br />

amendments and to the Approved specifications of the company. The installations<br />

have to be inspected and approved by the Electrical Inspector, Govt. of Orissa<br />

before energisation.<br />

(XIV) The total requirement of power shall be indicated by the tenderer in his tender and<br />

confirmed within thirty days from the date of Letter of Intent.<br />

(d) Land for Contractor’s Use<br />

(I) The Purchaser will at his own discretion and convenience and for the duration of<br />

the execution of the work make available near the site, land for construction of<br />

Contractor’s field office, godowns, workshops and assembly yard required for the<br />

execution of the contract. The Contractor shall at his own cost construct all these<br />

temporary buildings and provide suitable water supply and sanitary arrangement<br />

approved by the Engineer.<br />

(II) On completion of the works undertaken by the Contractor, he shall remove all<br />

temporary works erected by him and have the site cleared as directed by<br />

Engineer. If the Contractor fails to comply with these requirements, the Engineer at<br />

Tender Documents Commercial (Indigenous) Page 42 of 56