All instruments and control devices provided on panels shall be of miniaturized design,<br />

suitable for modular flush mounting on panels with front draw out facility and flexible plugin<br />

connection at rear.<br />

All electronic modules shall have gold plated connector fingers and further all input and<br />

output modules shall be short circuit proof. These shall also be tropicalised & components<br />

shall be of industrial grade or bette better.<br />

4.26 ELECTRICAL NOISE CONTROL<br />

The equipment furnished by the Contractor shall incorporate necessary techniques to<br />

eliminate measurement and control problems caused by electrical noise. Areas in<br />

Contractor's equipment which are vulnerable to electrica electrical l noise shall be hardened to<br />

eliminate possible problems. Any additional equipment, services required for effectively<br />

eliminating the noise problems shall be included in the proposal. The equipment shall be<br />

protected against ESD as per IEC IEC-801- 2. Radio Frequency equency interference (RFI) and Electro<br />

Magnetic Interference (EMI) protection against hardware damage and control system mal-<br />

operations/errors shall be provided for all systems.<br />

4.27 TAPPING POINTS FOR MEASUREMENTS<br />

Tapping points shall include probes, wwherever<br />

herever applicable, for analytical measurements and<br />

sampling. For direct temperature measurement of all working media, one stub with internal<br />

threading of approved pattern shall be provided along with suitable plug and washer. The<br />

Contractor will be intima intimated ted about thread standard to be adopted. The following shall be<br />

provided on equipment by the Contractor. The standard which is to be adopted will be<br />

intimated to the Contractor. Temperature test pockets with stub and thermo well Pressure<br />

test pockets<br />

4.28 ELECTRONIC MODULE/COMPONENT DETAILS<br />

The Contractor shall have to furnish all technical details including circuit diagrams,<br />

specifications of components, etc., in respect of each and every electronic card/module as<br />

employed on the various solid state as well as microprocessor based systems and equipment<br />

including conventional instruments, peripherals etc. It is mandatory for the Contractor to<br />

identify clearly the custom built ICs used in the package. The Contractor shall also furnish the<br />

details of any equivalents uivalents of the same.<br />

4.29 JUNCTION BOXES<br />

The junction boxes shall be made of minimum 2 mm thick sheet steel. Gland plates shall be<br />

removable type and made of 3 mm thick sheet steel. The boxes shall be provided with<br />

detachable cover or hinged door with captive screws. Top of the box shall be arran arranged to<br />

slope towards the rear of the box. The box shall be hot dip galvanized and shall be provided<br />

with suitable neoprene gaskets to achieve degree of protection of IP IP--55<br />

as per IS: 2147.<br />

Adequate spacing shall be provided to terminate the external cables cables. . The boxes shall be<br />

suitable for mounting on various types of steel structures. The terminal blocks provided shall<br />

be of 650 V grade, rated for 10 A for control cables. Suitable numbering for terminal blocks<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />

Page 25 of 27