25.04.2013 Views

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

.<br />

(xx) Contractor should provide identity badges for his employees. These should be properly<br />

displayed during working hours.<br />

(xxi) The Contractor shall employ only competent and skilled workmen fully experienced and<br />

capable of performing duties assigned for them. When local laws required the employee<br />

shall be required to acquire certificate of competency for his work from the competent<br />

authority.<br />

(xxii) Communication<br />

The Contractor will make his own arrangement for all his communications needs such as<br />

telephone, telex etc. at his site office and his residential area. Purchaser will assist in<br />

getting the above facilities, in case he finds and difficulty.<br />

(xxiii) First – Aid<br />

The Contractor shall provide necessary first-aid facilities for all his employees,<br />

representatives and workmen working at site. Enough number of contractor’s personnel<br />

shall be trained in administering first-aid.<br />

(xxiv) Welfare facilities<br />

44.15 Lines and Grades<br />

Contractor shall provide in his labor colony all necessary standard welfare facilities like<br />

canteen, shopping facility etc.<br />

All the works shall be performed to the lines/alignments, grades and elevations indicated on the<br />

drawing. The Contractor shall be responsible to locate and layout the works area. Basic horizontal<br />

and vertical control points will be established and marked by the Engineer at site at suitable points.<br />

These points shall be used as datum/reference points for the works under the contract. The<br />

Contractor shall inform the Engineer well in advance of the times and places at which he wishes to<br />

do work in the area allotted to him, so that suitable datum reference points may be established and<br />

checked by the Engineer to enable the Contractor to proceed with his works. Any work done<br />

without being properly located may be removed and/or dismantled by the Engineer at Contractor’s<br />

expenses.<br />

44.16 Fire Protection<br />

Tender Documents Commercial (Indigenous) Page 45 of 56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!