25.04.2013 Views

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PACKING, MARKING, SHIPPING AND DOCUMENTATION<br />

SPECIFICATIONS FOR INDIGENOUS MATERIALS<br />

ANNEXURE-XI<br />

3.9 Pipes with threaded or flanged ends shall be protected with suitable caps/covers before packing.<br />

Line pipes shall be transported only on Flat bed trailers. Semi low bed/low bed trailer shall not be<br />

used.<br />

The trailers used for transportation of Line Pipes shall be equipped with adequate pipe supports,<br />

having as many round hollow beds as there are pipes to be placed on the bottom of the trailer<br />

bed. Total width of the supports shall be at least 10% of the pipe length. These supports shall be<br />

lined with a rubber protection and shall be spaced in a manner as to support equal load from the<br />

pipes. The rubber protection must be free from all nails and staples where pipes are in contact.<br />

The second layer and the following layers shall be separated from each other with adequate<br />

number of separating layers of protective materials such as straw in plastic covers or mineral<br />

wool strips or equivalent, to avoid direct touch between the coated pipes. All stanchions of<br />

trailers used for transportation shall be covered by non -abrasive material like rubber belts or<br />

equivalent. Care shall be exercised to properly cover the top of the stanchions and other<br />

positions such as reinforcement of the trailer body rivets etc. to prevent damage to the coated<br />

surface.<br />

3.10 Detailed packing list in waterproof envelope shall be inserted in the package together with<br />

equipment/material. One copy of the detailed packing list shall be fastened outside the package<br />

in waterproof envelope and covered by metal cover.<br />

3.11 The Seller shall be held liable for all damages or breakages to the goods due to the defective or<br />

insufficient packing as well as for corrosion due to insufficient protection.<br />

3.12 Packaged equipment or material showing damage, defects or shortages resulting from improper<br />

packaging material or packing procedures or having concealed damage or shortages, at the time<br />

of unpacking shall be to the seller’s account.<br />

4.0 Marking<br />

4.1 Each package shall be marked on three sides with proper paints/indelible waterproof ink as<br />

follows:<br />

OWNER<br />

PROJECT<br />

DESTINATION<br />

Purchase Order No..................................................................................................... Net<br />

Wt.....................…………….... Kgs Gross Wt...................................... Kgs.<br />

Dimensions.......................................................X....................X...........................CM.<br />

Package No. (Sl. No. of total packages).........................................................................<br />

Seller’s Name.............................................................................................................<br />

4.2 Additional marking such as ‘HANDLE WITH CARE’, ‘THIS SIDE UP’, ‘FRAGILE’ or any other<br />

additional indications for protection and safe handling shall be added depending on the type of<br />

material.<br />

4.3 Specific marking with paint for ‘SLINGING and ‘CENTRE OF GRAVITY’ should be provided for all<br />

heavy lifts weighing 5 Tons and above.<br />

Page 2 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!