12.07.2015 Views

navmc dir 5100.8 marine corps occupational safety and ... - US Navy

navmc dir 5100.8 marine corps occupational safety and ... - US Navy

navmc dir 5100.8 marine corps occupational safety and ... - US Navy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MARCOR OSH PROGRAM MANUAL 15005b. Coordinate with the APM for planning <strong>and</strong> schedulingasbestos removal operations.c. Ensure personnel are trained <strong>and</strong> qualified respiratorusers in accordance with chapter 13 <strong>and</strong> are AHERA trained <strong>and</strong>accredited.d. Complete the NAVMC 11406, part 2, <strong>and</strong> certify part 3,step 1 for asbestos removal operations before beginning work,<strong>and</strong> provide a copy to the APM. Work shall commence only uponreceipt of a completed <strong>and</strong> certified NAVMC 11406 (certificationby the APM <strong>and</strong> industrial hygienist/workplace monitor).e. Ensure all tools removed from a regulated area arecompletely sealed in two layers of six mil polyethylene orcompletely decontaminated by being thoroughly vacuumed, washedwith amended water, <strong>and</strong> dried.f. Ensure only High Efficiency Particulate Air filter(HEPA) vacuums are used at jobs containing asbestos material.g. Ensure all asbestos waste is properly disposed of(confer with the installation or unit environmental compliancedepartment for guidance). 40 CFR 61 provides guidanceconcerning disposal.h. Ensure the job is certified visually clean after work iscomplete on the NAVMC 11406, part 3, step 2 <strong>and</strong> provide to theAPM.i. Disestablish asbestos containment area upon notificationby the APM that authorization is permitted.15005. CONTROL METHODS1. Work Clearance. Due to the inability to detect <strong>and</strong> containasbestos without specialized monitoring equipment <strong>and</strong> training,Marine Corps organizations or units are prohibited frominitiating any maintenance, renovation, demolition, or self-helpproject without first contacting the APM for work clearance.15-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!