12.07.2015 Views

navmc dir 5100.8 marine corps occupational safety and ... - US Navy

navmc dir 5100.8 marine corps occupational safety and ... - US Navy

navmc dir 5100.8 marine corps occupational safety and ... - US Navy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MARCOR OSH PROGRAM MANUAL 7004f. Interim measures are developed <strong>and</strong> provided with eachNAVMC 11400, OSH Deficiency Notice, as required <strong>and</strong> appropriate.g. Assist the supervisor of the work center inspected <strong>and</strong>the facilities department, as necessary, in the development ofabatement plans.h. Maintain a log of OSH deficiencies noted duringinspections to facilitate follow-up per paragraph 7009.i. Have the supervisor attach a copy of the deficiencynotice to the work request.j. Appraise the <strong>safety</strong> council or supervisor <strong>safety</strong>committee of all outst<strong>and</strong>ing OSH deficiencies having RAC of 1,2, or 3, that cannot be abated within 30 days.k. All inspection or discrepancy reports will be routedthrough the appropriate chain of comm<strong>and</strong>.3. Unit Safety. Unit <strong>safety</strong> personnel shall assure thefollowing are accomplished, <strong>and</strong> may delegate down the <strong>safety</strong>chain of comm<strong>and</strong> to the appropriate level, the responsibilityfor:a. Request an inspection when a report of unsafe orunhealthful working conditions or an ANYMO<strong>US</strong>E report is receivedthat indicates a formal <strong>safety</strong> inspection is required.b. If appropriate, endorse <strong>and</strong>/or revise work requestsinitiated by a supervisor of a work center concerning OSHdeficiencies prior to submission to facility department. If awork request is revised, the originator of the work requestshould be so informed.c. Provide copies of formal inspection reports to allaffected work areas with a request for a written response tonoted discrepancies.d. In a timely manner, consolidate all work centerresponses to formal inspection reports <strong>and</strong> send the consolidatedreport through the chain of comm<strong>and</strong> to the inspecting <strong>safety</strong>office. (Tenant comm<strong>and</strong>s may do their own OSH inspections.)7-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!