Draft pp. 3.1.233 and 3.1.235<br />

Issue<br />

195<br />

COSTS<br />

A commenter questioned whether 1) the Statement can estimate reporting cost to within<br />

a factor <strong>of</strong> two (+50%) and 2) if money is presently being collected from users to cover the<br />

costs <strong>of</strong> waste management. (217)<br />

Response<br />

Chapter 3.8 <strong>of</strong> the support document DOE/ET-0028 presents in detail the cost bases used<br />

in the Statement and discusses the effect <strong>of</strong> uncertainty on the cost assumptions. (see also<br />

final Section 3.2) In terms <strong>of</strong> commercial waste management, the only activity (involving<br />

utilities) that is presently occurring is water basin storage <strong>of</strong> spent fuel. The costs<br />

associated with this activity are assumed to be passed on to users <strong>of</strong> generated electricity.<br />

Draft p. 2.1.244<br />

Issue<br />

1973. (43)<br />

Response<br />

If the zero in Table 3.1.94 corresponds to the year 1986, this project was started in<br />

The table is structured in such a fashion that no particular repository (or project)<br />

start-up date is implied.<br />

Draft pp. M.55-85<br />

Issue<br />

One commenter requested that DOE reconcile differences in various cost estimates for<br />

independent spent fuel storage facilities. (1)<br />

Response<br />

Estimates <strong>of</strong> construction costs for an independent spent fuel storage facility have<br />

been published in several DOE reports. Most <strong>of</strong> these recent studies use cost estimates<br />

found in the reports listed below.<br />

Title Basin Size Cost Estimate<br />

Economics <strong>of</strong> Water Basin Storage <strong>of</strong> Spent LWR Fuel, 5000 MTHM $201 Million<br />

DPST-ISFS-78-1, Savannah River Laboratory, Aiken, SC, (1978)<br />

February 6, 1978 (SRP 1978).