23.04.2013 Views

Management of Commercially Generated Radioactive Waste - U.S. ...

Management of Commercially Generated Radioactive Waste - U.S. ...

Management of Commercially Generated Radioactive Waste - U.S. ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE A.9.1c. Allocation <strong>of</strong> Total-System <strong>Waste</strong> <strong>Management</strong> Unit Costs with the Once-Through Cycle Using a<br />

10% Discount Rate, mills/kWh<br />

Repository Spent Fuel<br />

Nuclear Power Startup Storage and Spent Fuel Research and<br />

Case Growth Assumption Date Transport Treatment Disposal Development Total<br />

1 Present Inventory Only 1990 0.28 0.02 0.12 to 0.15 0.90 1.3 to 1.4<br />

2010 0.32 0.004 0.02 0.87 1.2<br />

2030 0.33 0.0006 0.002 to 0.003 1.1 1.4<br />

None 0.33 0.28 0.61<br />

2 Present Capacity-- 1990 0.31 0.02 0.07 to 0.11 0.39 0.79 to 0.83<br />

Normal Life 2010 0.37 0.004 0.01 to 0.02 0.38 0.77<br />

2030 0.37 0.0005 0.0015 to 0.0026 0.47 0.85<br />

None 0.38 0.12 0.50<br />

3 250 GWe System by 1990 0.28 0.03 0.08 to 0.14 0.21 0.59 to 0.65<br />

ear 2000 and Normal 2010 0.37 0.01 0.02 to 0.03 0.19 0.58 to 0.59<br />

Life<br />

2030 0.38 0.0007 0.002 to 0.004 0.23 0.61<br />

None 0.38 0.06 0.44<br />

4 250 GWe System by 2000 0.36 0.01 0.04 to 0.06 0.20 0.61 to 0.63<br />

Year 2000 and Steady 2020 0.38 0.002 0.01 0.22 0.60 to 0.61<br />

State<br />

5 500 GWe System by 2000 0.36 0.01 0.04 to 0.07 0.19 0.60 to 0.62<br />

Year 2040 2020 0.38 0.002 0.002 0.01 0.21 0.59 to 0.60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!