6.26<br />

TABLE 6.1.7. Long-Term Radiological Impact <strong>of</strong> Primary <strong>Waste</strong> Barrier Breach<br />

<strong>Waste</strong> Type<br />

Spent Fuel HLW<br />

Normal Events (mrem/yr)<br />

Whole Body 7 x 10- 4 7 x 10- 4<br />

Bone 5 x 10- 4 5 x 10- 4<br />

Abnormal Events (mrem/event)(a)<br />

Whole Body Negligible Negligible<br />

Bone Negligible Negligible<br />

(a) Dose is 50-year dose commitment from 1 year intake to the maximum exposed<br />

individual.<br />

Nonradiological Health Effects. Although there are no specific data to evaluate the non-<br />

radiological health impact, it is expected that these impacts would be comparable to those<br />

found in the corresponding industries, e.g., mining, drilling, and excavating.<br />

6.1.1.6 Cost Analysis<br />

All cost estimates are in 1978 dollars based on January 1979 dollar estimates (Bechtel<br />

1979a) less 10 percent.<br />

The estimates are based on preliminary conceptual design data and were developed without<br />

the aid <strong>of</strong> previous cost estimates for this type <strong>of</strong> facility. Because <strong>of</strong> the high uncertain-<br />

ties in the cost <strong>of</strong> rotary drilled holes as large and deep as are called for in this VDH<br />

concept, the costs given should be considered only as preliminary estimates.<br />

Capital Costs<br />

On the basis <strong>of</strong> the waste system description, as presented in Section 6.1.1.2, the es-<br />

timate <strong>of</strong> the capital cost for the spent fuel case is approximately $2.3 billion. For the<br />

HLW case, a capital cost estimate is $290 million (Bechtel 1979a).<br />

Operating Costs<br />

Operating cost estimates for the spent fuel case have been calculated per year for years<br />

1 through 38 and then for phasedown years 39 and 40. These costs, which include VDH rotary<br />

drilling, moving emplacement structures, hole sealing, and receiving facilities operations,<br />

would be about $1.7 billion for each year through the 38th year, $1.6 billion for year 39,<br />

and $0.8 billion for year 40.<br />

For the HLW case for the same time periods, estimated costs would be $210 million for<br />

each year through the 38th year, $200 million for year 39, and $260 million for year 40.<br />

Decommissioning Costs<br />

Total estimated decommissioning cost for the spent fuel case would be $32 million. Total<br />

for the HLW case is estimated at $11 million.