23.04.2013 Views

Management of Commercially Generated Radioactive Waste - U.S. ...

Management of Commercially Generated Radioactive Waste - U.S. ...

Management of Commercially Generated Radioactive Waste - U.S. ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE A.9.1b. Allocation <strong>of</strong> Total-System <strong>Waste</strong> <strong>Management</strong> Unit Costs with the Once-Through Cycle Using a<br />

7% Discount Rate, mills/kWh<br />

Repository Spent Fuel<br />

Nuclear Power Startup Storage and Spent Fuel Research and<br />

Case Growth Assumption Date Transport Treatment Disposal Development Total<br />

1 Present Inventory 1990 0.35 0.04 0.18 to 0.22 1.1 1.6 to 1.7<br />

2010 0.44 0.01 0.05 to 0.06 1.1 1.6<br />

2030 0.47 0.002 0.01 1.5 2.0<br />

None 0.48 0.30 .78<br />

2 Present Capacity-- 1990 0.34 0.03 0.10 to 0.17 0.37 0.85 to 0.92<br />

Normal Life 2010 0.45 0.01 0.03 to 0.04 0.39 0.87 to 0.89<br />

2030 0.45 0.0025 0.01 0.53 1.0<br />

None 0.45 0.11 0.56<br />

3 250 GWe System by 1990 0.29 0.04 0.11 to 0.19 0.17 0.61 to 0.69<br />

Year 2000 and Normal 2010 0.44 0.01 0.04 to 0.06 0.16 0.65 to 0.68<br />

Life<br />

2030 0.46 0.003 0.01 to 0.02 0.21 0.68<br />

None 0.45 0.04 0.49<br />

4 250 GWe System by 2000 0.41 0.02 0.07 to 0.12 0.16 0.66 to 0.71<br />

Year 2000 and Steady 2020 0.45 0.01 0.02 to 0.03 0.19 0.67 to 0.69<br />

State<br />

5 500 GWe System by 2000 0.40 0.03 0.07 to 0.12 0.14 0.64 to 0.69<br />

Year 2040 2020 0.46 0.01 0.02 to 0.03 0.17 0.66 to 0.67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!