7.4<br />

The nuclear power growth cases and repository startup dates considered for the once-<br />

through cycle system simulation are shown in Table 7.1.2. A range <strong>of</strong> repository startup<br />

dates was used for the first three cases, that is, 1990 to 2010 representing the proposed<br />

program and 2010 to 2030 representing the alternative program. The 2010 startup provides<br />

both the last year <strong>of</strong> the range under the proposed program and the first year <strong>of</strong> the range<br />

under the alternative program. To simplify the analysis, only a single mid-range repository<br />

startup date, year 2000 representing the proposed program and 2020 representing the alterna-<br />

tive program, was used for Cases 4 and 5. However, the same potential range as in the other<br />

cases should be inferred.<br />

The nuclear power growth cases and reprocessing and repository startup dates considered<br />

for the reprocessing system simulation are shown in Table 7.1.3. Cases 1 and 2 were elimi-<br />

nated from consideration here because reprocessing was not considered to be credible under<br />

TABLE 7.1.2. Repository Startup Dates Considered in the Once-Through-Cycle<br />

System Simulations<br />

No-Action<br />

Nuclear Power Growth Cases Proposed Program Alternative Program Alternative<br />

1. Present Inventory Only 1990 to 20 10 (a) 20 10 (a) to 2030 None<br />

2. Present Capacity Normal<br />

( a )<br />

1990 to 2 0 10 2 0 1 0 ( a ) Life<br />

to 2030 None<br />

3. 250 GWe System by Year 2000<br />

and Normal Life<br />

1990 to 20 10 (a) 20 10 (a) to 2030 None<br />

4. 250 GWe System by Year 2000<br />

and Steady State<br />

2000 2020<br />

5. 500 GWe System by Year 2040 2000 2020<br />

(a) These cases are identical under both the proposed and alternative programs.<br />

TABLE 7.1.3. Reprocessing and Repository Startup Date Combinations<br />

Considered in the Reprocessing-Cycle System Simulations<br />

Proposed Program Alternative Program<br />

Nuclear Power Growth Cases Reprocessing Repository Reprocessing Repository<br />

3. 250 GWe System by Year 2000 1990 1990 1990 2010(a)<br />

and Normal Life 1990 20 10 (a) 2010 2010<br />

2010 2 0 10 (a) 1990 2030<br />

2010 2030<br />

4. 250 GWe System by Year 2000 2000 2000 2000 2020<br />

and Steady State<br />

5. 500 GWe System by Year 2040 2000 2000 2000 2020<br />

(a) These cases are identical under both the proposed and alternative programs.