196<br />

COSTS<br />

Title Basin Size Cost Estimate<br />

Conceptual Design Report for the Away From Reactor 5000 MTHM $270 Million<br />

Spent Fuel Storage Facility, DOE-3547, U.S.<br />

(1978-84)<br />

Department <strong>of</strong> Energy, December 1978 (DOE 1978b).<br />

Technology for Commercial <strong>Radioactive</strong> <strong>Waste</strong><br />

<strong>Management</strong>, DOE/ET-0028, U.S. Department <strong>of</strong> Energy,<br />

Vol. 3, May 1979.<br />

3000 MTHM $200 Million<br />

(1976)<br />

The December 1978 Conceptual Design Report is an updated estimate <strong>of</strong> the venture guid-<br />

ance appraisal on which the Savannah River report was based, and includes additional costs<br />

for independent service facilities. The estimates in the present Statement are based on<br />

the DOE/ET-0028 report.<br />

The table below presents a summary comparison <strong>of</strong> costs in DOE-3547 and DOE/ET-0028.<br />

$ Millions<br />

Adjustment to Common Basis DOE/ET-0028 DOE-3547<br />

Initial Cost Estimate 200 270<br />

Add 2000 MTHM Storage Capacity<br />

48<br />

Add Service Allowance<br />

3<br />

Adjustment to Receive Older Fuel (12)(a) --<br />

Include Storage Baskets - 24<br />

Delete 85% <strong>of</strong> Owners Cost (46)(a) -<br />

Adjust to 1978 Dollar Basis 33 (43)(a)<br />

Estimated Cost in 1978 $ Excluding Interest During 226 251<br />

Construction<br />

(a) Figures in parenthesis are subtracted.<br />

Thus, the two estimates agree within 10%.<br />

Draft Appendix N<br />

Issue<br />

One commenter stated that bases for cost estimates for transportation <strong>of</strong> spent fuel<br />

and waste should be referenced in the final document. (113-EPA)<br />

Response<br />

DOE agrees. Section 3.2.8.4 <strong>of</strong> the final Statement summarizes the cost methodology<br />

for transportation and notes that additional detail can be found in DOE/ET-0028, Volume 4.<br />

The predisposal cost section in the final Statement (Section 4.9) also notes that addi-<br />

tional detail on predisposal facility costs can be found in DOE/ET-0028, Volumes 2, 3 and 4.