23.04.2013 Views

Management of Commercially Generated Radioactive Waste - U.S. ...

Management of Commercially Generated Radioactive Waste - U.S. ...

Management of Commercially Generated Radioactive Waste - U.S. ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE 6.2.8. Estimated Resource Commitments for Various Repositories<br />

Critical Resource Mined Repository(a c ) Very Deep Hole(b) Subseabed(b) Space(b)<br />

Aluminum, MT 220 13,000 13,000 83,000<br />

Chromium, MT -- 14,000 14,000 5,000<br />

Nickel, MT -- 7,500 7,500 2,000<br />

Water, m<br />

Natural Gas or<br />

1,300,000 199,000,000 -- 60,000,000<br />

Propane, m 11,500 10,000,000 10,000,000 10,000,000<br />

Electricity, kWh<br />

PetroleumiDerived<br />

3,400,000,000 56,000,000,000 20,000,000,000 59,000,000,000<br />

Fuel, m 5,300,000 6,000,000 5,100,000 1,500,000<br />

Other Fuel, MT -- -- -- 4,800,000<br />

(a) Highest consumption construction scenarios <strong>of</strong> Tables 5.4.2 and 5.4.3 added to operational<br />

values.<br />

(b) Highest consumption scenario indicated <strong>of</strong> Section 6.1.<br />

(c) Island mined repository has similar commitments.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!