19.04.2015 Views

review the material found here - JoCo Serve

review the material found here - JoCo Serve

review the material found here - JoCo Serve

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

and <strong>the</strong> urban environment.<br />

Methods used will be mechanical<br />

removal of fuel, mechanical<br />

thinning of fuel, and/or prescribed<br />

fire.<br />

Action<br />

ID<br />

DeSoto<br />

1<br />

DeSoto<br />

2<br />

DeSoto<br />

3<br />

Johnson County – City of De Soto<br />

Hazard Addressed Status Responsible Entity Estimated cost and Funding Source<br />

Action/Description Priority Goal(s)<br />

Addressed<br />

Flood Control Projects H 1,2 Flood, Soil Erosion & Dust On-going De Soto Engineering<br />

Division<br />

Back-up generators for Fire Station and<br />

<strong>the</strong> EOC<br />

Fire Station Windstorm Damage<br />

Mitigation<br />

H 2 Lightning, Tornado,<br />

Utility/Infrastructure<br />

Failure, Winter Storm<br />

Cost: Unknown<br />

Funding: City and County General<br />

Funds, HMGP Grants and Special<br />

Benefit Districts<br />

Completion Date:<br />

On-going City of De Soto Cost: $55,000,<br />

Funding: city funds, Grants, Bonds,<br />

and CIP<br />

Completion Date:<br />

H 2 Wind Storm On-going City of De Soto Cost: $65,000.<br />

Funding: Budget, Bonds or Mitigation<br />

Grant funds<br />

Completion Date:<br />

Johnson County – City of Edgerton<br />

Action ID Action/Description Priority Goal(s)<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

Addressed<br />

Edgerton 1 NFIP – continued compliance H 1,2 Flood On-going City of Edgerton Cost: Unknown<br />

Funding: City funds<br />

Completion Date:<br />

Edgerton 2<br />

Edgerton Storm Shelter , currently<br />

this is no shelter<br />

Edgerton 3 Portable Electric Generators M 1,2 Lightning, Tornado,<br />

Utility/Infrastructure<br />

Failure, Winter Storm, Wind<br />

Storm<br />

Edgerton 4<br />

Edgerton Strom Siren System<br />

Expansion<br />

M 1 Tornado On-going City of Edgerton Cost: Unknown<br />

Funding: HMGP<br />

Completion Date:<br />

On-going City of Edgerton Cost: $14,400 - $157,000<br />

Funding: Potential grant<br />

Completion Date:<br />

M 4 Windstorm, Tornado On-going City of Edgerton Cost: $21,000<br />

Funding: City’s capital reserve funds<br />

with matching grant<br />

Completion Date:<br />

Edgerton 5 207 th Street Grade Separation H 1,2 All Hazards On-going City of Edgerton, Johnson<br />

county<br />

Cost: $10 - $15 million<br />

Funding: Federal and State Highway<br />

4.22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!