55,000 residents. The<br />

Department's facilities also<br />

includes approximately 180 miles<br />

of water transmission and<br />

distribution lines, pumping<br />

stations, well field, and five million<br />

gallons of potable water storage.<br />

39 Coordinate county and local<br />

government mitigation efforts with<br />

Rural Electric Cooperatives<br />

(REC’s), encourage identification<br />

of hazards potentially affecting<br />

<strong>the</strong>ir infrastructure, assessment of<br />

<strong>the</strong> vulnerabilities of <strong>the</strong><br />

infrastructure to <strong>the</strong>se hazards,<br />

and identification of mitigation<br />

strategies. Long-term planning<br />

goals that will reduce exposure to<br />

loss of electrical power are<br />

beneficial to all organizations and<br />

citizens within <strong>the</strong> jurisdiction.<br />

Power loss during extreme<br />

periods of cold or heat increase<br />

damage potential to people and<br />

property.<br />

M 1,2,4 Utility/Infrastructure Failure On-going City, county Planners,<br />

RECs<br />

Cost: Unknown<br />

Funds: NA<br />

Completion Date: 31 Dec 2017<br />

Leavenworth County – City of Basehor<br />

Action ID Action/Description Priority Goal(s)<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

Addressed<br />

1 Identify flash-flood prone areas to<br />

consider flood reduction measures<br />

to city/county planners. Flood<br />

zone mapping has provided initial<br />

identification of potential hazard<br />

areas that can be <strong>review</strong>ed with<br />

o<strong>the</strong>r data sources, such as <strong>the</strong><br />

watershed districts goals and<br />

objectives, in developing long<br />

range planning activities for flood<br />

prevention, or o<strong>the</strong>r planning<br />

steps to reduce exposure to this<br />

hazard.<br />

L 1,2 Flood On-going,<br />

2 major<br />

flash flood<br />

prone<br />

areas<br />

identified<br />

(1 has<br />

been<br />

corrected)<br />

Floodplain Manager, City<br />

Planner, City<br />

Superintendent Public<br />

Works<br />

Cost: NA<br />

Funds: Local<br />

Completion Date: 31 Dec 2018<br />

2 Incorporate <strong>the</strong> inspection and<br />

management of trees into <strong>the</strong> city<br />

maintenance program that may<br />

pose a threat to <strong>the</strong> electrical lines<br />

that could result in power outages<br />

during ice storms. Significant<br />

M 1,2 Winter Storm, Wind Storms On-going,<br />

Open<br />

Ended<br />

City Superintendent, Codes<br />

Enforcement Officer<br />

Cost: NA<br />

Funds: Local, State, Federal<br />

Completion Date: continuous<br />

4.72