USD233 2<br />

Back up generators for food<br />

production center, central office,<br />

and designated Jr High for<br />

community shelter. These three<br />

designated facilities are critical to<br />

communities’ disaster response<br />

plans. As new additions and<br />

remodeling occurs, new back-up<br />

generators should be purchased<br />

for <strong>the</strong>se three facilities.<br />

M 2 Lightning, tornado,<br />

utility/infrastructure failure,<br />

winter storm, windstorm<br />

On-going<br />

School District<br />

Administration<br />

Cost: Unknown<br />

Funding: Unknown<br />

Completion Date: 1 – 5 years<br />

Johnson County – USD 512 Shawnee Mission<br />

Action ID Action/Description Priority Goal(s)<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

Addressed<br />

USD512 1 Shawnee Mission Schools Safe<br />

Rooms. USD 512 is among <strong>the</strong><br />

cooperating school districts now<br />

undertaking a study of tornado<br />

safety shelters for KSDE. This<br />

action plan shows intent to follow<br />

up on this study to provide safe<br />

rooms w<strong>here</strong> current shelter areas<br />

are lacking. Work with district<br />

architects for <strong>the</strong> safe room to be<br />

constructed in accordance with<br />

FEMA publication #361, “Design<br />

and Construction Guidance for<br />

Community Shelters”.<br />

H 1,2 Tornado, Windstorm On-going Shawnee Mission<br />

Operations & Maintenance<br />

Department<br />

Cost: Unknown<br />

Funds: Bond and/or capital funds,<br />

HMGP<br />

Completion Date: Unknown<br />

Johnson County – Kansas School of <strong>the</strong> Deaf<br />

Action ID Action/Description Priority Goal(s)<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

Addressed<br />

KSD 1<br />

ADA Community Safe Room.<br />

The student population is<br />

multiply disabled including<br />

blindness. Moving <strong>the</strong>m around<br />

as a group is slow and<br />

H 1,2 Windstorm, Tornado New Unified Government,<br />

KSSDB Superintendent<br />

Cost: Unknown<br />

Funds: FEMA Grant<br />

Completion Date: 12 – 18 months<br />