provide <strong>the</strong> expertise in this field to<br />

help <strong>review</strong> and upgrade plans for<br />

<strong>the</strong> district.<br />

Action ID Action/Description Priority Goal(s)<br />

Addressed<br />

1 The safe room for <strong>the</strong> new school<br />

will be located on <strong>the</strong> lower level;<br />

however, it will have an on-grade<br />

entrance/exit due to <strong>the</strong> terrain of <strong>the</strong><br />

site. Three walls are below grade.<br />

The elevator will allow <strong>the</strong> 2nd and<br />

3rd floor staff and students with<br />

disabilities (and wheelchair bound<br />

students) to access <strong>the</strong> safe room.<br />

2 The district is vulnerable to <strong>the</strong> threat<br />

of tornadoes and TSTM Winds. The<br />

current MacArthur Elementary<br />

School has a designated tornado<br />

area but <strong>the</strong> construction design of<br />

<strong>the</strong> old school (built in 1956) is very<br />

vulnerable to tornadoes and TSTM<br />

winds. The new school has a<br />

planned capacity to host over 1000<br />

students and staff. The safe room is<br />

designed to be located on <strong>the</strong> lower<br />

level. The safe room will have an on<br />

grade entrance and exit due to <strong>the</strong><br />

site terrain. Three walls are below<br />

grade with one on grade. The safe<br />

room will also be accessible from an<br />

elevator to accommodate children<br />

and adults with disabilities as well as<br />

stairs. It will be part of <strong>the</strong> initial<br />

construction of <strong>the</strong> new elementary<br />

school at Fort Leavenworth.<br />

Leavenworth County – USD 207<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

H 1,2 Tornadoes, Windstorm On-going<br />

(Inprogress)<br />

USD 207 Board of<br />

Education; CFO (business<br />

manager) will tract progress<br />

of project .<br />

H 1,2 Tornadoes, Windstorm New USD 207 Board of<br />

Education; CFO (business<br />

manager) will tract progress<br />

of project along with<br />

architectural firm (BCDM)<br />

and Titan Construction<br />

Company<br />

Cost: $28.6 million<br />

Funds: FEMA Grant and USD 207<br />

Completion Date: 31 Dec 2013<br />

Cost: $1.2 million<br />

Funds: Local<br />

Completion Date: August 2015<br />

Wyandotte County<br />

Action ID Action/Description Priority Goal(s)<br />

Addressed<br />

Wyandotte County<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

4.90