such as <strong>the</strong> watershed districts goals<br />

and objectives, in developing long<br />

range planning activities for flood<br />

prevention, or o<strong>the</strong>r planning steps to<br />

reduce exposure to this hazard.<br />

2 Develop and fund professional<br />

services to augment <strong>the</strong> City of<br />

Tonganoxie's GIS capability to<br />

provide condition investigation,<br />

analysis of streamways, develop<br />

stream buffer mapping, provide<br />

updated 2 ft. interval hypsography for<br />

<strong>the</strong> entire Tonganoxie growth area to<br />

allow for improved storm water<br />

modeling and management, draft a<br />

stream buffer zoning ordinance for<br />

<strong>the</strong> city, produce digital 2 ft. contour<br />

mapping for use in storm water<br />

analysis and planning, and develop<br />

interactive floodplain and property<br />

parcel GIS application and database<br />

for use by city staff. Utilization of<br />

GIS capabilities should be expanded<br />

to include <strong>the</strong> use of ArcInfo and<br />

AutoCad format for various floodrelated<br />

projects throughout <strong>the</strong> City<br />

of Tonganoxie and <strong>the</strong> Tonganoxie<br />

Growth Area.<br />

3 Research funding options for<br />

professional services and<br />

construction of stream bank<br />

stablization on Tonganoxie Creek<br />

within <strong>the</strong> city limits of Tonganoxie.<br />

The City of Tonganoxie has identified<br />

a need for professional services and<br />

construction for stream bank<br />

stabilization at various locations on<br />

Tonganoxie Creek w<strong>here</strong> bank<br />

erosion threatens public utilities or<br />

private improvements.<br />

4 Research and fund engineering<br />

services for a city-wide storm water<br />

infrastructure-needs assessment.<br />

The City of Tonganoxie has identified<br />

<strong>the</strong> need for professional services<br />

to perform a storm water<br />

infrastructure needs assessment<br />

throughout <strong>the</strong> City of Tonganoxie.<br />

5 Seek contractors proposal to perform<br />

maintenance activities along<br />

Tonganoxie Creek within <strong>the</strong> city<br />

limits of Tonganoxie. The City of<br />

M 1,2 Flood On-going City of Tonganoxie Planner,<br />

City Engineer<br />

M 1,2 Flood On-going City of Tonganoxie, City<br />

Engineer<br />

M 1,2 Flood On-going City of Tonganoxie<br />

Engineer<br />

M 1,2 Flood On-going City of Tonganoxie, City<br />

Engineer<br />

Cost: 65,000<br />

Funds: Local, State, Federal<br />

Completion Date: 31 Dec 2015<br />

Cost: $25,000<br />

Funds: Local, State, Federal<br />

Completion Date: 31 Dec 2015<br />

Cost: $25,000<br />

Funds: Local, State, Federal<br />

Completion Date: 31 Dec 2015<br />

Cost: $15,000<br />

Funds: Local, State, Federal<br />

Completion Date: 31 Dec 2015<br />

4.83