Wyandotte County – Kansas State School for <strong>the</strong> Blind<br />

Action ID Action/Description Priority Goal(s)<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

Addressed<br />

KSSB 1 ADA Community Safe Room. The<br />

student population is multiply<br />

disabled including blindness.<br />

Moving <strong>the</strong>m<br />

around as a group is slow and<br />

cumbersome. The school buildings,<br />

w<strong>here</strong> students spend most of <strong>the</strong>ir<br />

day, were built prior to <strong>the</strong> 1950's<br />

and are not equipped with<br />

reinforced construction required to<br />

provide truly safe protection from<br />

tornadoes or o<strong>the</strong>r severe wea<strong>the</strong>r<br />

related incidents. Currently<br />

hallways are designated as tornado<br />

shelter areas. We do this because<br />

many buildings have no basement .<br />

An ADA Safe Room on <strong>the</strong> main<br />

level would allow us to move <strong>the</strong><br />

students to this area in a short<br />

period of time w<strong>here</strong> <strong>the</strong>y were safe<br />

and w<strong>here</strong> <strong>the</strong>y can be <strong>found</strong> easily<br />

by emergency personnel.<br />

H 1,2 Windstorm, Tornado On-going,<br />

Assessme<br />

nt has<br />

been<br />

complete.<br />

Unified Government, KSSB<br />

Superintendent<br />

Cost: Unknown<br />

Funds: FEMA Grant<br />

Completion Date: 12 – 18 months<br />

KSSB 2<br />

Back up Generator. We have<br />

medically fragile students with<br />

multiple handicaps many of whom<br />

live on site. Loss of power would<br />

expose <strong>the</strong>m to danger from health<br />

risks from lowered temperatures<br />

and safety risks from<br />

exposure to alternative heating<br />

sources like kerosene heaters or<br />

o<strong>the</strong>r exposed flames. Over <strong>the</strong><br />

years during loss or power incidents<br />

<strong>the</strong> students have been at risk. The<br />

campus was originally built in mid<br />

l800’s <strong>the</strong> wiring is antiquated. We<br />

have multiple separate power feeds<br />

into <strong>the</strong> campus. The generator<br />

would allow us to better protect <strong>the</strong><br />

students in <strong>the</strong> event of a major<br />

crisis like an Ice Storm – <strong>the</strong><br />

generator would prevent students<br />

being exposed to dangerous<br />

environments such as loss of heat,<br />

open heaters, kerosene heaters,<br />

H 1,2 Utility Failure, Windstorm,<br />

Winter Storm<br />

On-going<br />

Unified Government, KSSB<br />

Superintendent<br />

Cost: $230,000 total<br />

Funds: FEMA HMGP<br />

Completion Date: 8 – 10 months<br />

4.135