19.04.2015 Views

review the material found here - JoCo Serve

review the material found here - JoCo Serve

review the material found here - JoCo Serve

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Action ID Action/Description Priority Goal(s)<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

Addressed<br />

1 Develop and fund mitigation projects<br />

for <strong>the</strong> construction of tornado safe<br />

rooms in <strong>the</strong> schools of USD #453.<br />

Schools are particularly vulnerable to<br />

potential damage from tornadoes<br />

and high winds. Students, faculty,<br />

and staff should seek safe shelter<br />

when a tornado threatens. Tornado<br />

safe rooms should be constructed in<br />

schools of USD 453 to ensure a safe<br />

place for students to go during a<br />

tornado event. Safe rooms may be<br />

funded during new school<br />

construction as part of school<br />

additions or as retrofits.<br />

M 1,2 Tornado, Windstorm On-going School District, FEMA Cost: Unknown<br />

Funds: FEMA<br />

Completion Date: 31 Dec 2015<br />

Action ID Action/Description Priority Goal(s)<br />

Addressed<br />

1 Develop and fund mitigation projects<br />

for <strong>the</strong> construction of tornado safe<br />

rooms in <strong>the</strong> schools of USD #458 in<br />

both Basehor and Linwood. Schools<br />

are particularly vulnerable to<br />

potential damage from tornadoes<br />

and high winds. Students, faculty,<br />

and staff should seek safe shelter<br />

when a tornado threatens. Tornado<br />

safe rooms should be constructed in<br />

schools of USD 458 to ensure a safe<br />

place for students to go during a<br />

tornado event. Safe rooms may be<br />

funded during new school<br />

construction, as part of school<br />

additions, or as retrofits.<br />

Leavenworth County – USD 458<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

M 1,2 Tornado, Windstorm On-going School District, FEMA Cost: Unknown<br />

Funds: FEMA<br />

Completion Date: 31 Dec 2015<br />

2 Assess elevations and water flow in<br />

<strong>the</strong> district to qualify <strong>the</strong> benefit of<br />

flood control projects in <strong>the</strong> District.<br />

The Basehor-Linwood Unified School<br />

District #458 would like to analyze<br />

<strong>the</strong> potential benefits of constructing<br />

soil-based berms, and o<strong>the</strong>r flood<br />

M 1,2 Flood On-going School District Cost: Unknown<br />

Funds: Local, State, Federal<br />

Completion Date: 31 Dec 2015<br />

4.87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!