MHills 4<br />

MHills 5<br />

flood events and <strong>the</strong>n use <strong>the</strong><br />

City’s Code Red (reverse 911) to<br />

notify those that would be likely to<br />

be affected so <strong>the</strong>y can take<br />

precautions/evacuate <strong>the</strong> area.<br />

Phase III would install automatic<br />

bollards that come out of <strong>the</strong><br />

roadway to block traffic when <strong>the</strong><br />

creek sensors indicate that <strong>the</strong><br />

roadway will be overtopped with<br />

water.<br />

Realign Brush Creek in Hiawassee<br />

park. Wenonga Road that abuts<br />

Hiawassee Park historically<br />

overtops when significant rain<br />

events happen.<br />

Peetwood Park Improvements.<br />

Indian lane abuts this park and<br />

historically <strong>the</strong> roadway is<br />

overtopped with water when<br />

<strong>the</strong>re is a significant rain event.<br />

Stormwater Management Advisory<br />

Council<br />

Completion Date:<br />

Phase II – within 5 years<br />

Phase III- within 10 years.<br />

M 1,2 Flood On-going City Administrator Cost: $138,600<br />

Funding: City Funds<br />

Completions Date: 2017<br />

H 1,2 Flood Completed City Administrator Cost: $1,026,000<br />

Funding: Stream Channel Project –<br />

State of Kansas, Johnson County<br />

SMAC, Bridge Project<br />

Completion Date: Completed<br />

Johnson County – City of Mission Woods<br />

Action ID Action/Description Priority Goal(s)<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

Addressed<br />

MWoods 1 Re-join NFIP. M 1,2 Flood Ongoing/Open<br />

Ended<br />

City of Mission Woods Cost: Unknown<br />

Funding: NA<br />

Completion Date: never ending.<br />

Action ID Action/Description Priority Goal(s)<br />

Addressed<br />

Ola<strong>the</strong> 1 Cedar Creek Wastewater<br />

Treatment Plan Flood Wall. The<br />

Cedar Creek Wastewater<br />

Treatment Plan (CCWWTP) has<br />

been flooded several<br />

times. The operating permit for<br />

<strong>the</strong> plant requires flood<br />

protection to withstand 500 year<br />

Johnson County – City of Ola<strong>the</strong><br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

H 2 Flood On-going Wastewater<br />

Superintendent<br />

Cost: $1,000,000<br />

Funding: Revenue bonds, grants<br />

Completion Date: 2010-2011<br />

4.28