RainbowM 2<br />

for <strong>the</strong> facility. Procure, install and<br />

maintain appropriate redundant<br />

communications systems that will<br />

enable communication within and<br />

outside <strong>the</strong> agency in a timely and<br />

continual manner.<br />

Construct Food and Water Storage<br />

Shed / Area. Currently, <strong>the</strong> facility<br />

does not have enough storage to<br />

meet <strong>the</strong> storage needs for both<br />

food (perishable and nonperishable)<br />

and water for 96 hours.<br />

Construct a secure Food and Water<br />

Storage Shed / Area with electricity<br />

to include heating, cooling and<br />

plumbing systems, an intrusion<br />

alarm system and adequate<br />

security lighting.<br />

M 1,2 All Hazards On-going Rainbow Mental Health<br />

Facility, Director of Safety<br />

and Environment<br />

Cost: Unknown<br />

Funds: Local, Grants, donations,<br />

combination<br />

Completion Date: 1 – 2 years<br />

Wyandotte County – University of Kansas Hospital<br />

Action ID Action/Description Priority Goal(s)<br />

Hazard Addressed Status Responsible Entity Estimated Cost and funding Source<br />

Addressed<br />

KUHosp 1 Construct Saferoom as part of new<br />

office complex construction. KU<br />

Hospital has plans to construct a<br />

new office complex within <strong>the</strong> next<br />

5 years. As part of that construction<br />

effort, <strong>the</strong> hospital will consider<br />

incorporating a tornado saferoom to<br />

accommodate patients and staff in<br />

that facility. As part of <strong>the</strong><br />

construction planning, <strong>the</strong> hospital<br />

will determine <strong>the</strong> feasibility of<br />

incorporating <strong>the</strong> construction of a<br />

tornado saferoom in <strong>the</strong> design of<br />

<strong>the</strong> planned office complex. If<br />

determined feasible, <strong>the</strong> hospital<br />

will seek funding for <strong>the</strong> saferoom<br />

through FEMA’s Hazard Mitigation<br />

Grant Program<br />

H 1,2 Windstorm, Tornado On-going University of Kansas<br />

Hospital<br />

Cost: $120 sq ft @ 5 ft per person<br />

Funds: FEMA<br />

Completion Date: Unknown<br />