SH2<br />

SH1<br />

Shawnee 5<br />

Shawnee 1<br />

Shawnee 2<br />

refuge built to FEMA standards in<br />

all new construction because of<br />

this issue. The City of Shawnee<br />

will <strong>review</strong> all future building plans<br />

and <strong>review</strong> <strong>the</strong> ability to add a<br />

safe room for citizens and<br />

employees in buildings such as<br />

libraries, public safety buildings,<br />

general use buildings and o<strong>the</strong>r<br />

buildings as appropriate. Federal<br />

funding to assist with <strong>the</strong> building<br />

of <strong>the</strong> safe room may be sought.<br />

Public Education for<br />

city/community in Disaster<br />

Preparedness. No community<br />

outreach at this time. Establish an<br />

EM position first, <strong>the</strong>n CERT, <strong>the</strong>n<br />

try to take education out to<br />

community at large.<br />

No storm shelters or basement<br />

built into <strong>the</strong> new Justice Center.<br />

Facility sits on a hill on I435<br />

corridor. High potential for wind<br />

and/or tornado damage. Free<br />

standing storm shelter or<br />

underground, behind <strong>the</strong> Justice<br />

Center.<br />

Improve flood hazard areas<br />

through <strong>the</strong> use of conveyance<br />

system structural Improvement.<br />

Conveyance system structural<br />

improvements can be an effective<br />

means for flood damage reduction<br />

. Prioritize locations w<strong>here</strong> flood<br />

damages have/may occur and<br />

design/construct improvements as<br />

funding becomes available.<br />

Floodplain Management. Current<br />

minimum federal requirements<br />

allow fill in <strong>the</strong> floodplain and<br />

rising of <strong>the</strong> water<br />

surface elevation. The City would<br />

also like to continue to be<br />

compliant with <strong>the</strong> NFIP.<br />

Restrict/eliminate development in<br />

<strong>the</strong> existing and future conditions<br />

floodplains and acquire land if<br />

necessary.<br />

Shawnee believes in active code<br />

enforcement and follows national<br />

standards regarding all building<br />

codes. In <strong>the</strong> past we have<br />

M 3 All Hazards New Acting Emergency Manager Cost: $5,000 - $10,000<br />

Funds: General Fund<br />

Completion Date: Continuous<br />

H 1,2 Tornado, Windstorm New Acting Emergency Manager Cost: $10,000 to $400,000<br />

Funds: Non Available<br />

Completion Date: Unknown<br />

H 1 Flood On-going, Public Works Director Cost: Unknown<br />

Funds: Stormwater Management<br />

Program, State, Federal<br />

Completion Date: on-going<br />

H 1,2 Flood On-going,<br />

Open<br />

Ended<br />

H 1,2 All Hazards On-going,<br />

Open<br />

Ended<br />

Public Works Director<br />

Public Works Director<br />

Cost: Unknown<br />

Funds: State, Federal<br />

Completion Date: Continuous<br />

Cost: Unknown<br />

Funds: County, Federal<br />

Completion Date: Continuous<br />

4.40