13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSLB. 4 NSPS - Fuel Burning Equipment<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 101 of291EU 4.33 40 CFR 60.42bU) SO, percent reduction requirements are not II.A.2(f) Fuel(2/27/06) applicable to units combusting only very low Oil Sulfursulfur oil. Boeing shall demonstrate that the Contentoil meets tl,e definition of very low sulfur oil Monitoringby maintaining fuel receipts as described in 40 ProcedureCFR 60,49b(r).40 CFR 60.41 b(2/27/06)For units constructed, reconstructed, ormodified on or before February 28, 2005, verylow sulfur oil means oil that contains no morethan 0.5 weight percent sulfur or that, whencombusted without sulfur dioxide emissioncontrol, has a sulfur dioxide emission rateequal to or less than 0.5 Ib/MMBtu heat input.EU 4.34 40 CFR 60.43b(f) Opacity limit when combusting oil is 20% (6- II.A.2(r) EPA Method(2/27/06) minute average) except for one 6-minute Continuous 9 (See 40average period per hour of not more than 27% Emission CFR Part 60opacity.MonitoringAppendix A,July 1,2001)SystemEU 4.35 40 CFR 60.43b(g) The opacity standards (EU 4.34) apply at all NMR(2/27/06),60.46b(a) times while burning oil, except during periods(2/27/06) of startup, shutdown, or malfunction.EU 4.36 40CFR Nitrogen oxide emission limit when II.A.2(r) 40CFR60.44b(a)(J )(i) combusting oil and natural gas is 0.10 Continuous 60.46b(e)(2/27/06) Ib/MMBtu (expressed as N02) heat input. EmissionMonitoringSystemEU 4.37 40 CFR 60.44b(h) The nitrogen oxide standards under EU 4.36 NMR(8/14/01),60.46b(a) apply at all times including periods of startup,(2/27/06) shutdown, or malfunction.EU 4.38 40 CFR 60.44b(i) Compliance with the nitrogen oxide emission NMR(2/27/06) limit in EU 4.36 is determined on a 30-dayrolling average basis.EU 4.39 40 CFR 60.45bQ) Facilities that combust very low sulfur oil are II.A.2(f) Fuel(2/27/06) not subject to the compliance and performance Oil Sulfurtest requirements of 40 CFR 60.45b ifthe Contentfacility obtains fuel receipts as per 40 CFR Monitoring60.49b(r).ProcedureBoeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10,2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!