13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

v. STANDARD TERMS AND CONDITIONS<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 274 of291N.8 40 CFR 63.9(b)(3) SI3/03 For a new or reconstructed affected sonrce subject to a NESHAP with an initial No later than 120startup after the effective date of a relevant standard and for which an application days after initialfor approval of construction or reconstruction is not required under 40 CFR startup.63.S(d), submit an initial notification to the <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> inaccordance with 40 CFR 63.9(b )(3).N.9 40 CFR 63.9(e), 40 SI3/03 Boeing shall notifY the Control Officer in writing of its intention to conduct a At least 60 daysCFR 63. 9(i), NESHAP performance test at least 60 calendar days before the performance test is before thescheduled to begin to allow the Control Officer to review and approve the site- performance test is<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong>3123106 specific test plan required under 40 CFR 63. 7( c), if requested by the Control scheduled to begin.<strong>Air</strong> <strong>Agency</strong> Reg I:State Only Officer, and to have an observer present dnring the test.3.07N.IO 40 CFR 63.9Q) S130/03 For vapor degreasing operation, aerospace coating operations, and reinforced Within IS days ofcomposite operations subject to the NESHAP, Boeing shall send changes in determining changes<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> 9126102information already provided under 40 CFR 63.9 to the <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> in infonnation<strong>Air</strong> <strong>Agency</strong> State Only<strong>Agency</strong> within IS daysneededRegulation III, 2.02N.ll WAC 173-401-724 11/4/93 Notice of off permit changes Contemporaneous(VLD Off <strong>Permit</strong> Changes)with the changeN.12 <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> 3122107 Asbestos project notification Up to 10 days prior<strong>Air</strong> <strong>Agency</strong> Reg. State Only (IV.C Asbestos) (Note: Includes all notifications required under Reg. III, SectionIII, Section 4.03 4.03)N.l3 WAC 173-401- 11/4/93 Notice of Emergency Within 2 days of64S(d) (V.R Emergencies) exceeding emissionlimits.N.14 40 CFR 63.S90S 4/21103 Initial Reinforced Plastic Composites NESHAP Notification of Compliance See AOP Section(V.Q.7(a) Initial Compliance Notifications)V.Q.7(a)Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10.2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!