V. STANDARD TERMS AND CONDITIONS<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 268 of 291sections of this permit, the reporting requirements listed in other sections of the permit shallgovern.Aerospace NESHAP semiannualreport(V.Q.3(b) Semiannual ComplianceCertification Reports)Aerospace NESHAP annual report(V.Q.3(c) Annual ComplianceCertification Reports)Reinforced Plastic CompositesNESHAP Compliance Report(V.Q.7(b»Semiannual ComplianceReport)Reinforced Plastic CompositesNESHAP (V.Q.7(d) Report ofExceeding 100 tpy Organic HAPs)Periodic startup, shutdown,malfunction report (applicable toAerospace NESHAP only)(V.Q.3(e) Startup, Shutdown, andMalfunction Reports)Immediate SSM report (applicable toAerospace NESHAP only)(V.Q.3(e) Startup, Shutdown, andMalfunction Reports)NSPS Excess Emission andMonitoring Systems PerfonnanceReports - Nitrogen Oxides & Opacity(V.Q.6(a) NSPS Excess Emissionand Monitoring Systems PerformanceReports - Nitrogen Oxides &Opacity)NSPS Summary Reports - NitrogenOxides & Opacity(V.Q.6(b) NSPS NOx Emissions)40CFR63.753(b)(l)40CFR63.753(c)(1)40CFR63.753(c)(2)40 CFR63.5910(a), (b), (c), (d),and (g)40 CFR 63.5900(b)40 CFR 63.5910 (I)40CFR63. 1 0(d)(5)(i)40CFR63 .JO( d)(5)(ii)40 CFR 60.7(c), 40CFR 60.49b(h)40 CFR 60.7(d)Semiannually, by August 30th for the reportingperiod of January through June and by February28th for the reporting period of July throughDecember. All deviations must also be reportedconsistent with V.Q.l(b) Deviation Reports.Annually, by February 28 for the reporting periodof January through December of the previous year.Semiannually, by August 30th for the reportingperiod of January through June and by February 28for the reporting period of July through December.All deviations must also be reported consistentwith V.Q.l(b) Deviation ReportsAs needed.Semiannually, by August 30 lh for the reportingperiod of Januruy through June and by February28 1h for the reporting period of July throughDecember.Consistent with V.Q.I (b) Deviation Reports.Monthly - 30 days after the end of each calendarmonth.Monthly - 30 days after the end of each calendarmonth.Boeing-Everett <strong>Permit</strong>, issued September 12,2008,' Administrative Amendment 3: October 10,2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!