13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLB.3 Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 45 of 291EU 3. 66EU3.67EU 3. 68EU 3. 69EU 3. 7040CFR63.745(g)(2)(i)(B)(12/8/00)40CFR63.745(g)(2)(i)(C)(12/8/00)40 CFR63.745(g)(2)(ii)(A)(12/8/00)40 CFR63.745(g)(2)(ii)(B)(12/8/00)40CFR63.745(g)(2)(iii) (12/8/00)For existing booths 01' hangars where primers ortopcoats containing inorganic HAPs are spray applied,the air stream must be exhausted through a waterwashsystem that remains in operation during all coatingapplication operations. Alternatively, may choose tocomply with 40 CFR 63.745(g)(2)(i)(A), EU 3. 65, 01'40 CFR 63.745(g)(2)(i)(C), EU 3. 67.For existing booths or hangars where primers ortopcoats containing inorganic HAPs are spray applied,the ail' stream must be exhausted through an airpollution control system that meets or exceeds theefficiency data points in Tables I and 2 and isapproved by the permitting authority. Alternatively,may choose to comply with 40 CFR63.745(g)(2)(i)(A), EU 3. 65,01' (B), EU 3. 66.11.A.2(i)AerospaceNESHAPPressureDroplWaterFlow RateMonitoring andRecordkeepingProcedureI1.A.2(c)Documentationon FileFor new booths or hangars where primers or topcoats II.A.2(c) 319containing inorganic HAPs are spray applied, the air Documentationstream must be exhausted through a dry particulate on Filefilter system that is certified using Method 319 to meetor exceed the efficiency data points in Tables 3 and 4.Altcrnatively, may choose to comply with 40 CFR63.745(g)(2)(ii)(B), EU 3.69.For new booths or hangars where primers or topcoatscontaining inorganic HAPs are spray applied, the airstTeam must be exhausted through an air pollutioncontrol system that meets or exceeds the efficiencydata points in Tables 3 and 4 and is approved by thepermitting authority. Alternatively, may choose tocomply with 40 CFR 63.745(g)(2)(ii)(A), EU 3. 68.Alternate control technology options for sources forwhich construction commenced after June 6, 1994, butbefore October 29, 1996.ILA.2(a)Approval by the<strong>Puget</strong> <strong>Sound</strong><strong>Clean</strong> <strong>Air</strong><strong>Agency</strong>. viaNOCIOrder ofApprovalIl.A.2(a)Approval by the<strong>Puget</strong> <strong>Sound</strong><strong>Clean</strong> <strong>Air</strong><strong>Agency</strong>, viaNOCIOrder ofApprovalBoeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October J 0, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!