13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

II. MONITORING, MAINTENANCE, AND RECORDKEEPING <strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 201 of291Failure to take corrective action as described above must be reported under SectionV.M Compliance celiifications or V.Q Reporting of this permit.[WAC 173-401-615(1)(b), 10/17/02](vii)Reserved(viii)Reserved(ix)Reserved(x) Gasoline Station Stage 1 Inspection RequirementsReg. 11, 2.07 (12/9/99)Boeing shall visually inspect the Stage 1 system after each product delivery. Anyequipment found to be defective (e.g., loose caps or adapters, stuck poppet valves,damaged gaskets) shall be repaired or replaced as soon as possible, but no later thanseven days after the inspection. [<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Regulation II,Section 2.07(b)(2), 12/9/99](xi)Gasoline Station Stage 1 Inspection RequirementsReg. 11 Section 2.07, (9/27/07)Boeing must inspect the dual-point stage 1 system between each gasoline delivery fordefects as described in the following table. If the facility receives more than onedelivery to a tank in a day, the inspection is only required once per day.Boeing-Everett <strong>Permit</strong>, issued September J 2, 2008,' Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!