13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V. STANDARD TERMS AND CONDITIONS<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 269 of291NSPS Nitrogen Oxides ContinuousEmission Monitoring Report(V.Q.6(a) NSPS Excess Emissionand Monitoring Systems PerformanceReports - Nitrogen Oxides &Opacity)NSPS Fuel Oil Sulfur Content Report(V.Q.6(d) S02)Regulation I Article 12NOx Order of Approval Reports(V.Q.6(c) NOx Order of ApprovalRequirement)Compliance certificationV.M Compliance certificationsSemiannual deviation report(V.Q.1(a) Semiannual <strong>Operating</strong><strong>Permit</strong> Reports)<strong>Permit</strong> deviations which represent apotential threat to human health orsafety(V.Q.1(b) Deviation Reports)Other permit deviations includingfailure to repair any defectiveequipment(V.Q.1(b) Deviation Reports)Emission inventory statement(V.Q.2 Annual Emission Inventory)VOC CIC Report for 747 and 767.(II.A.2(p) Emission EstimatesRequired by PSD or Order ofApproval <strong>Permit</strong> Condition)40 CFR 60.49b(i)40 CFR 60.49b(r)Reg I, Section12.03, 4/911998Order of ApprovalNo. 7438Condition #12WAC 173-401-630(5)WAC 173-401-615(3)(a)WAC 173-401-615(3)(b)WAC 173-401-615(3)(b)Reg. I, 7.09(a)Order of ApprovalNo. 3913,Condition #4,5/22/95Monthly - 30 days after the end of each calendarmonth.30 days after the end of each calendar quarter.Monthly - 30 days after the end of each calendarmonth.Monthly - 30 days after the end of each calendarmonth.Annually - February 28 for the previous calendaryear.Note: (This Report must be submitted to both EPAandPSCAA)August 30 for period January I-June 30 andFebruary 28 for period July I-December 31.As soon as possible but no later than 12 hours ofdiscovery of the deviation.Monthly - within 30 days after the end of themonth in which the deviation is discovered.Note: If Boeing is claiming the emergency defenseof WAC 173-401-645 the report must be submittedwithin two working days.Annually, by April 15'" for the previous reportingperiod, or by a different date ifspecifjed by the<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong>.Annually, by June 15'h for the previous reportingperiod.Boeing-Everett <strong>Permit</strong>, issued September} 2, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!