13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTS1.B.8 Composite Processing Operations<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 154 of291EU 8.5940 CFR 63.5835(a)(4/21/03)Boeing must be in compliance at all timeswith the work practice standards in Table 4of 40 CFR 63 Subpart WWWW (EU 8.42through EU 8.47), as well as the organicHAP emissions limits in Tables 3 of 40 CFR63 Subpart WWWW (EU 8.48 through EU8.53) or the organic HAP content limits inTable 7 of 40 CFR 63 Subpart WWWW(II.A.2(z», as applicable.Il.A.2(c)Documentationon FileII.A.l(d) WorkPracticeInspectionIl.A.2(z)ReinforcedPlasticCompositesNESHAP Use ofSame ResinAcross DifferentOperationsOption~~~~~~C~F~R~~O"~J~'~f~~~~~~~m~u~s~t~~~~p~el~.~~or~m~a~n~c~e~te~s~ts~'~~~NM~R~~~tt~~~~--~(4/2l103)performance evaluations, designevaluations, capture efficiency testing, andother initial compliance demonstrations byApril 21, 2006, except open moldingoperations that elect to meet an organicHAP emissions limit on a 12-month rollingaverage must initiate collection of therequired data on April 21, 2006, anddemonstrate compliance April 21, 2007.EU 8.6140 CFR 63.5860(a)(4I2l103)Boeing shall demonstrate initial compliancewith each applicable organic HAP emissionsstandard in 63.5805(a) tlu'ough (h) (EU 8.40and EU 8.41) using the procedures shown in40 CFR 63 Subpart WWWW Tables 8 and9 (II.A.2(aa».Il.A.2(aa)ReinforcedPlasticCompositesNESHAP InitialComplianceBoeing-Everett <strong>Permit</strong>, issued September J 2, 2008; Administrative Amendment 3: October J 0, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!