13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSI.B.17. Emergency Stationary Internal Combustion EnginesExpiration Date:<strong>Permit</strong> No. 13120September 12,2013Page 181 of291EU 17.7 40 CFR 60.14(c) Addition of an affected facility to a stationary source(10/17/00)shall not by itself bring within the applicability of 40CFR Part 60 any other facility within the source.EU 17.8 40 CFR60.14(e) Examples listed in 40 CFR 60.14(e) shan not be(10/17/00)considered modifications under 40 CFR Part 60.EU 17.9 40 CFR 60.14(1) Special provisions in an applicable subpart shall(10/17/00)supersede this section.EU17.10 40 CFR 60.14(g)(10117/00)EU 17.11 40 CFR60.15(a)(12/16175)Within 180 days of a change subject to 40 CFR60.14(a), compliance with all applicable standards mustbe achieved.An existing facility upon reconstruction becomes anaffected facility.EU 17.12 40 CFR 60.15(b) Reconstruction means the replacement of components(12/16175) of an existing facility that the fixed capital cost exceeds50% ofthe cost required to construct a comparable newfacility and it is technologically and economicallyfeasible to meet the applicable standards.EU 17.13 40 CFR 60.15(c) Fixed capital cost means the capital needed to provide(12/16175) all the depreciable components.EU 17.1 40 CFR60.15(d) If the fixed capital cost exceeds 50%, the facility must(12/16175) notifY the Administrator of the proposed replacement60 days before construction is commenced.EU 17.15 40 CPR 60.19(b) If an explicit postmark deadline is not specified in an(2112/98) applicable requirement for the submittal of anotification, application, report, or other writtencommunication to the Administrator, the owner oroperator shall postmark the submittal on or before thenumber of days specified in the applicable requirement.The use of reliable non-Government mail carriers thatprovide indications of verifiable delivery ofinformation required to be submitted to <strong>Puget</strong> <strong>Sound</strong><strong>Clean</strong> Ail' <strong>Agency</strong>, similar to the postmark provided bythe U.S. Postal Service, or alternative means ofdelivery, including the use of electronic media, agreedto by the permitting authority, is acceptable.NMRNMRNMRNMRNMRNMRNMRNMRNMRBoeing~Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October J 0, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!