13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSLB. 4 NSPS - Fuel Burning EquipmentPennitNo.13120Expiration Date: September 12,2013Page 99 of291EU 4.22 40 CFR 60.14(e) Examples listed in 40 CFR60.14( e) shall not NMR(10117/00) be considered modifications under 40 CFRPart 60.EU 4.23 40 CFR 60.14(1) Special provisions in an applicable subpart NMR(10/17/00) shall supersede this section.EU 4.24 40 CFR 60.14(g) Within 180 days of a change subject to 40 NMR(10117100) CFR 60. 14(a), compliance with all applicablestandards must be achieved.EU 4.25 40 CFR 60.15(a) An existing facility upon reconstruction NMR(12116175) becomes an affected facility.EU 4.26 40 CFR60.15(b) Reconstruction means the replacement of NMR(12116175) components of an existing facility that thefixed capital cost exceeds 50% of the costrequired to construct a comparable newfacility and it is technologically andeconomically feasible to meet the applicablestandards.EU 4.27 40 CFR 60.15(c) Fixed capital cost means the capital needed to NMR(12/16175) provide all the depreciable components.EU 4.28 40 CFR 60. I 5(d) If the fixed capital cost exceeds 50%, the NMR(12/16175) facility must notifY the Administrator of theproposed replacement 60 days beforeconstruction is commenced.EU 4.29 40 CFR 60.15(g) Individual subparts of 40 CFR Part 60 may NMR(12/16175) include specific provisions, which refine anddelimit the concept of reconstruction in thissection.Boeing-Everett <strong>Permit</strong>, issued September J 2, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!