13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

II. MONITORING, MAINTENANCE, AND RECORDKEEPING <strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 205 of 291<strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Regulation II Section 2.07. After conducting the trainingrequired by this section, Boeing must prepare a written training report that includes:• name and address of person conducting the training,• date of the training, and• names of the persons trained.[<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Reg. II, Section 2.07(e), 9/27/07](xv) Gasoline Station Stage 2 Testing RequirementsReg. II, 2.07, (9/27/07)If the gasoline throughput exceeds 200,000 gallons annually, Boeing must comply withthe following additional provisions.Boeing must perform compliance tests of the vapor balance Stage 2 vapor recoverysystem at least once every 24 months. These compliance tests must be done inaccordance with the CARB test procedures contained in following table and mustinclude:Static Pressure Decay TP-201.3 March 17, 1999Dynamic Back Pressure TP-201.4 July 3, 2002Tank-Tie Test TP-201.3C March 17, 1999Note: Tank-tie test must be conducted at leas once, or after any tank configuration changes to showthe tanks are manifolded. The tank-tie test records must always be kept on-site to verifY compliance.Each time a test is conducted, the test shall also include a review of the on-site recordsrequired by this rule including: training, selt~inspections, gasoline throughput, andtesting.[<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Regulation II, Section 2.07(t)(1), 9/27/07]If the Stage 2 system fails the compliance test, Boeing shall repair or replace thedefective equipment on the day of the test. If the defective equipment cannot bereplaced on the day of the test, Boeing shall notify the <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong>Boeing-Everett <strong>Permit</strong>, issued September 12, 2008,' Administrative Amendment 3: October 10,2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!