13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSI.B.3 Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 59 of291EU 3.106 <strong>Puget</strong> <strong>Sound</strong><strong>Clean</strong> <strong>Air</strong><strong>Agency</strong> Reg1: 7.09(b)(9/10/98)Boeing shall develop and implement an O&M plan toassure continuous compliance with <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong>Ail' <strong>Agency</strong> Regulations I, II, and III.II.B OperationandMaintenance(O&M) PlanRequirements.Thismonitoringrequirementsupersedes themonitoringmethod for thisrequirementlisted in I.A.IIEU 3. 107<strong>Puget</strong> <strong>Sound</strong><strong>Clean</strong> <strong>Air</strong><strong>Agency</strong> RegI: 9.20(6/9/88)All equipment must be maintauled in good workingorder.1I.A.2( d)(ii)Spray Boothsand OtherParticulateControlBoothsII.A.I(c)FacilityInspectionsThesemonitoringmethodssupersede themonitoringmethod for thisrequirementlisted in I.A.l 0EU 3. 108Order ofApproval No.7498,ConditionNo.3Boeing shall limit spray coating operations outside ofa spray enclosure to operations such as:(a) Coating areas that were covered by holdingfixtures, tooling, or protective masking during originalIf.A.I(c)FacilityInspectionsBoeing-Everett <strong>Permit</strong>, issued September 12,2008; Administrative Amendment 3: October 10,2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!