13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLB.17. Emergency Stationary Internal Combustion EnginesExpiration Date:<strong>Permit</strong> No. 13120September 12,2013Page 184 of291EU 17.25 40 CFR 60.4211(e) Emergency stationary lCE may be operated for the(7/11106) purpose of maintenance checks and readiness testing,provided that the tests are recommended by Federal,State, or local government, the manufacturer, thevendor, or the insurauce company associated with theengine. Maintenance checks and readiness testing ofsuch units is limited to 100 hours per year. There is notime limit on the use of emergency stationary ICE inemergency situations. Anyone may petition theAdministrator for approval of additional hours to beused for maintenauce checks and readiness testing, buta petition is not required if the owner or operatormaintains records indicating that Federal, State, or localstandards require maintenance and testing ofemergency ICE beyond 100 hours per year. For ownersand operators of emergency engines meeting staudardsunder 40 CFR 60.4205, but not 40 CFR 60.4204, anyoperation other than emergency operation, andmaintenance and testing as permitted in this section, isprohibited.EU 17.26 40 CFR60.4214(b) If the stationary Cl internal combustion engine is an(7111/06) emergency stationary internal combustion engine, theowner or operator is not required to submit an initialnotification.EUforII.A.2(c)Documentation onFileNMREmissions Standards63 SubpartEU 17.27 40 CFR 63.6590(a) An affected source is any existing, new, Of(1118/08) reconstructed stationary RICE located at a major orarea source of HAP emissions, excluding stationaryRICE being tested at a stationary RlCE test cell/stand.NMREU 140CFR A stationary RICE with a site rating of more than 50063.6590(a)(2)(i) brake HP located at a major source of HAP emissions(1118/08) is new if you commenced construction of the stationaryRICE on or after December 19, 2002.NMREU 17.29 40CFRA stationary RICE with a site rating of equal to or less63.6590(a)(2)(ii) than 500 brake HP located at a major source of HAP(1/18/08) emissions is new if you commenced construction of thestationary RICE on or after June 12,2006.NMRBoeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!