13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSI.B.3 Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 44 of291EU 3. 6240 CFR63.743(b)(4/20/06)Boeing must prepare a startup, shutdown and ILA.2( c)malfunction plan required for water wash booths and Doctunentationdry particulate filter systems not operated per the on Filemanufacturer's instructions. 1n addition to theinformation required in 40 CFR 63.6, this plan shallalso include the following provisions:(1) The plan shall specify the operation andmaintenance criteria for each air pollution contToldevice or equipment and shall include a standardizedchecklist to document the operation and maintenanceof the requirement;(2) The plan shall include a systematic procedure foridentifying malfunctions and for reporting themimmediately to supervisory personnel: and(3) The plan shall specify procedures to be followed toensure that equipment or process malfunctions due topoor maintenance or other preventable conditions donot occur.EU 3. 6340CFR63.743(b)(4120/06)Dry particulate filter systems operated per themanufacturer's instructions are exempt from a startup,shutdown and malfunction plan required by 40 CFR63.6(e)(3).NMREU 3. 6440CFR63.745(g)(1)(12/8/00)Boeing shall apply aerospace primers and topcoats ina booth or hangar with airflow directed downward,onto or across and exhausted through one or moreoutlets.II.A.I(c)FacilityInspectionsEU 3. 6540 CFR63.745(g)(2)(i)(A)(12/8/00)For existing booths or hangars where primers ortopcoats containing inorganic HAPs are spray applied,the air stream must be exhausted through a dryparticulate filter system certified using Method 319 tomeet or exceed the efficiency data points in Tables Iand 2. Alternatively, may choose to comply with 40CFR 63.745(g)(2)(i)(B), EU 3.66, or (C), EU 3. 67.1I.A.2(c)Documentationon FileEPAMethod319 (See40 CFRPart 63,AppendixA, July I,2001)Boeing-Everett <strong>Permit</strong>, issued September 12, 2008,' Administrative Amendment 3: October la, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!