13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSLB. 4 NSPS - Fuel Burning Equipment<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 111 of291air, hot water, steam, or other heated fluids byexternal combustion of fuel, such as boilersand water heaters.)ILA.l(c)FacilityInspectionsThesemonitoringmethodssupersede themonitoringmethod for thisrequirementlisted in I.AAEU 4.60 WAC 173-400-050(1) & (3) (3/22/91)This requirementwill be supersededupon adoption ~f the2/10/05 version ofWAC 173-400-050into the SIPWAC 173-400-050(1) & (3) (2/10/05)(State Only) Thisrequirement will befederallyenforceable uponadoption into theSIP and will replacethe 3/22/91 versionof WAC 173-400-050Shall not emit particulate matter in excess of0.10 grldscf corrected to 7% 0, fromcombustion units except for emission unitscombusting wood derived fuels for theproduction of steam. (Applies to units usingcombustion for waste disposal, steamproduction, chemical recovery or otherprocess requirements, but excludes outdoorburning.)II.A.2(d)(iv)SteamGeneratingBoilersII.A.l(b)ComplaintResponseII.A.l(c)FacilityInspectionsThesemonitoringmethodssupersede themonitoringmethod for thisrequirementlisted in I.AAEPAMethod 5(See 40CFRPart60,AppendixA, July I,2001)Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!