13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSI.B.3 Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 88 of291EU 3. 206 PSD-05-02, 1. 787 Final Assembly consists of all 787 II.A.2(p)Condition manufacturing operations that occur in the 787 Final EmissionNo.3, 8125/05 Assembly area. These operations include joining the Estimatesairplane body sections into a complete fuselage; Required byintegration of flight control surfaces and raked tip to PSD or Orderwings; joining the wings, vertical fin, and horizontal of Approvalstabilizers to the fuselage; hanging the engines; <strong>Permit</strong>installing the wing-to-body fairings, landing gear, Conditiondoors, auxiliary power system, other aircraft systems(e.g. electrical, hydraulic, fuel), and interiors; partassembly; rework; testing; and processes normallyassociated with aircraft Final Assembly.2. Boeing Everett may include additional processesrelated to 787 manufacturing operations similar tothose listed above under Final Assembly with priorwritten approval from the <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong><strong>Agency</strong>.3. VOC emissions from 787 Final Assembly shall notexceed 49 tons in any 12 consecutive months.EU 3. 207 PSD-05-02, 1. Interiors Manufacturing includes all operations II.A.2(p)Condition associated with manufacturing stow bins, crew rests~ EmissionNo.4 8/25/05 partitions/class dividers, closets, ceilings and sidewall Estimatespanels, doors and door way liners, and other airplane Required byinterior components, and processes normallyassociated with aircraft Interiors Manufacturing.PSD or Orderof Approval<strong>Permit</strong>2. Boeing Everett may include additional processes Conditionrelated to the manufacture and assembly ofcomponents similar to those listed above underInteriors Manufacturing with prior written approvalfrom the <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong>.3. VOC emissions from Interiors Manufacturing shallnot exceed 205 tons in any 12 consecutive months.EU 3.208 PSD-05-02,ConditionNo.ll,8/25/05Nothing in this determination shall be construed so asto relieve the company of its obligations under anystate, local, or federal laws or regulations.NMRBoeing-Everett <strong>Permit</strong>, issued September J 2, 2008; Administrative Amendment 3: October J 0, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!