13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLB.3 Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 60 of 291EU 3. 109Order ofApproval No.7498,ConditionNo.4(b) Coating over sealants applied throughout themanufacturing process,(c) Coating areas which are imperfections like poorcoverage, scratched, damaged paint, runs in paint, tisheyes, etc.,(d) Coating areas on large subassemblies normallyscheduled to be painted in ventilated enclosures, butrequired to travel due to out-of-sequence work,(e) Coating areas of fasteners, components,assemblies, subassemblies, or surfaces that are joined,replaced, damaged, repaired, or trimmed,(1) Coating prior to joining dissimilar metalcomponents,(g) Stencil, decorative, or temporary markingoperations,(h) Touchup of bushings and other similar parts,(i) Sealant detackif)dng,U) Coating operations on the assembly flightline, and,(k) Coating areas on large subassemblies or parts thatare too large to be reasonably handled in an enclosedspray booth.Boeing shall not cause or allow fallout from spraypainting operations such that the presence of thefallout remains visible at or near any building exhaust.(3/3/99)==L,------;-c~~=II.A. I (c)FacilityInspectionsBoeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!