13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSI.BJ Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 28 of291EU3. I40CFR63.I(c)(1),63.4 (4/5/02)Aerospace operations must comply with 40 CFR 63Subpart A and GG.NMR40CFR63.741 (b)(9/1/98)EU 3. 240 CFR 63.5(4/5/02)Boeing shall comply with preconstruction reviewrequirements.NMREU3.340 CFR63.6(b)(2)(4120106)New and reconstructed affected sources that have aninitial startup after the effective date of 40 CFR 63Subpart GG must comply with the requirements of 40CFR 63 Subpart GG upon startup.NMREU 3. 440CFR63.6(e)(I)(4120106)At all times, including startup, shutdown andmalfunction, must operate and maintain affectedsources consistent with safety and good air pollutioncontrol practice for minimizing emissions.Malfunctions must be corrected as soon as practicableafter their occurrence. During periods of startup,shutdown, or malfunction, reduce emissions to thegreatest extent which is consistent with safety andgood air pollution control practices.Il.A.2(d)(ii)Spray Boothsand OtherParticulateControlBoothsII.A.2(i)AerospaceNESHAPPressureDroplWaterFlow RateMonitoringandRecordkeepingBoeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!