13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

II. MONITORING, MAINTENANCE, AND RECORDKEEPING <strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 220 of29140 CFR 60.44b (EU 4.36). The I-hoUl' averages shall be calculated using the datapoints required under 40 CFR 60.13(b). At least 2 data points must be used tocalculate each I-hour average. [40 CFR 60.48b( d), 2/27/06]Boeing shall follow the procedures under 40 CFR 60.13 for installation, evaluation,and operation of the CEMS. [40 CFR 60.48b(e), 2/27/06].The span value for the CEMS measuring NOX shall be 200 ppm. [40 CFR60.48b(e)(2) & (3), 2/27/06; Letter dated October 11, 2001, D. Hardesty to F.Migaiolo, Request for Alternate Monitoring and Alternate Span Value Calibrationfor NOx CEMs at Three Boilers in the Boeing Everett facility.]When NOx data are not obtained due to CEMS breakdowns, repairs, calibrationchecks and zero and span adjustments, Boeing shall use Method 7E or otherapproved reference methods to provide emissions data for a minimun1 of 75% of theoperating hours in each steam generating unit operational day, in at least 22 out of 30successive steam unit generating unit operating days. [40 CFR 60.48b(f), 92/27/06].(iii) Qua/ity AssuranceThe NOx and oxygen monitoring systems are subject performance specificationsunder Appendix B and Appendix F. [40 CFR 60.13(a), 6/1106](a) All continuous monitors shall meet the performance specifications contained in 40CFR Part 60 Appendix B [40 CFR 60.13(a), 6/1106] in effect at the time of itsinstallation. [<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> Ail' <strong>Agency</strong> Reg I: 12.03( c), 4/9/98; <strong>Puget</strong><strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Reg. I: 12.03(c), 9123104, State Only].(b) All gaseous continuous emission monitors shall be maintained and operated inaccordance with the requirements of 40 CFR Part 60, Appendix F, 01' alternaterequirements approved by the <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> Ail' <strong>Agency</strong> [40 CFR 60.13(a),6/1106] The requirements of 40 CFR Part 60, Appendix F that must be followedshall be those in effect July 1, 1997 [<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> Ail' <strong>Agency</strong> Reg. I,12.03(c), 4/9/98] and July 1, 2005 [<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> Ail' <strong>Agency</strong> Reg. I,12.03(c),9123104, State Only].(c) All relative accuracy tests shall be subject to the provisions of<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong>Ail' <strong>Agency</strong> Regulation I, Section 3.07 [<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> Ail' <strong>Agency</strong> Reg I:Boeing-Everett.<strong>Permit</strong>, issued September 12,2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!