13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

II, MONITORING, MAINTENANCE, AND RECORDKEEPING <strong>Permit</strong> No, 13120Expiration Date: September 12, 2013Page 190 of291requirement and corrects that problem within 24 hours, Boeing does not need to reportthe deviation under Section V,M Compliance certifications or V,Q Reporting and doesnot need to record such action under Section V,O,1.4 of the permit. Boeing shall alsopromptly repair defective insignificant emission units,[WAC l73-401-615(1)(b), 10/17/02](d) Work Practice InspectionBoeing shall conduct facility-wide inspections of work practice activities that areapplicable requirements at least once per calendar quarter, Each facility-wide inspectionshall include inspection of the Model 777 assembly area described in PSD 91-06,Amendment 2, Work practices shall be randomly sampled during the facility-wideinspection and observed for consistency with permit requirements, Boeing shall, as soonas practicable but within 24 hours of identification, correct any potential complianceproblems with respect to applicable requirements for which this section ILA.! (d) is anapplicable monitoring method identified by these quarterly inspections, or any other time,shut down the unit or activity to which the work practice applies until the problem can becorrected, or report according to Section V,Q,5 Report of Problems not Corrected Within24 Hours, If Boeing observes potential compliance problems for which there are nomonitoring requirements under an applicable regulation, and corrects that problem within24 hours, Boeing does not need to report the deviation under Section V,M, Compliancecertifications or v, Q Reporting and does not need to record such action under SectionV,O,1.4 of this permit, except that deviations from the spray gun cleaning requirementsunder 40 CFR 63,744(c) must be reported in the Aerospace NESHAP semi-ammal reportin accordance with Section V,Q,3(b), Examples of such requirements that do not havemonitoring requirements include, but not limited to, 40 CFR 63,744(a)(I) (EO 3, 33)Place cleaning solvent-laden cloth, paper or any other absorbent applicator used forcleaning in bags or other closed containers upon completing their use, and 40 CFR63,744(a)(3) (EO 3, 36) Handling and transfer of cleaning solvents conducted in a mannerto minimize spills, For the purpose of determining compliance with the work practicerequirements of 40 CFR 63,744(a)(\) (EO 3, 33) for solvent rag management,"completing their use" means upon completion of the cleaning operation, before leavingfor a break, or the end of a shift, whichever comes first.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008,' Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!